My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2015
>
060215
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2015 12:00:18 PM
Creation date
5/28/2015 9:08:22 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/2/2015
DESTRUCT DATE
15Y
DOCUMENT NO
4
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKGROUND <br /> On an annual basis, the City has two projects designed to maintain the City's roadway <br /> infrastructure. One of these projects is the resurfacing of various roadways by overlaying <br /> existing pavement with a new layer of asphalt concrete, while the other project is slurry <br /> sealing a different set of roadways as preventative maintenance. <br /> The street resurfacing component includes installing a new layer of asphalt concrete over <br /> the existing pavement, repairing pavement distressed areas, crack sealing, adjusting <br /> manholes and water valve boxes to grade, installing pavement markers, and installing <br /> traffic detector loops. The roadway preventative maintenance component includes <br /> preparatory work for the upcoming slurry seal project (CIP No. 145004). The preventative <br /> work will include sealing pavement cracks and repairing pavement distressed areas. <br /> This preparatory work is generally required prior to the start of the slurry sealing operation <br /> and is included under the project in order to realize cost savings and for optimum results. <br /> The slurry seal project is scheduled to begin construction upon the completion of the <br /> preventative maintenance component under this project. <br /> DISCUSSION <br /> The first component of the project consists of approximately 1,121,000 square feet of <br /> pavement resurfacing for the following streets: <br /> STREET NAME BEGIN LOCATION END LOCATION TREATMENT <br /> UTAH ST WYOMING ST BERNAL AVE SAMI <br /> WYOMING ST WASHINGTON ST NEVADA ST SAMI <br /> CALIFORNIA AVE STANLEY BLVD NEVADA ST <br /> SAMI <br /> BERNAL AVE NEVADA ST STANLEY BLVD <br /> SAM <br /> WASHINGTON ST CALIFORNIA ST E/O WYOMING SAMI <br /> NEVADA ST BERNAL AVE CALIFORNIA AVE SAMI <br /> LINDA WAY ANGELA ST NEAL ST SAMI <br /> SUTTER GATE AVE MOHR AVE END SAMI <br /> JONES GATE CT SUTTER GATE AVE END SAMI <br /> HARTLEY GATE CT LIN GATE ST END SAM <br /> LIN GATE CT LIN GATE ST END SAMI <br /> LIN GATE ST SUTTERGATE AVE END SAMI <br /> LARAMIE GATE CIR SUTTERGATE AVE(SOUTH) SUTTER GATE AVE(NORTH) _ SAM <br /> LARAMIE GATE CT LARAMIE GATE CIR END SAMI <br /> SMITH GATE CT MOHR AVE END SAMI <br /> KNOX GATE CT MOHR AVE END SAM <br /> FUNSTON GATE CT MOHR AVE END SAMI <br /> ROSS GATE CT MOHR AVE END SAMI <br /> ROSS GATE WAY MOHR AVE SUTTER GATE AVE SAMI <br /> TANAGER CT SHEARWATER RD END OUF <br /> TANAGER DR SUTTER GATE AVE MOHR AVE OUF <br /> TANAGER DR MOHR AVE SHEARWATER RD OUF <br /> TAHOE CT TANAGER DR END OUF <br /> WOODTHRUSH CT MOHR AVE END OUF <br /> Page 2 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.