My WebLink
|
Help
|
About
|
Sign Out
05
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2015
>
042115
>
05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2015 2:48:16 PM
Creation date
4/14/2015 3:42:43 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/21/2015
DESTRUCT DATE
15Y
DOCUMENT NO
5
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kimley>>>Horn <br /> Sub-Task C:Prepare Final PS&E <br /> Kimley-Hom will meet with the City to review comments on the 100% PS&E and the City will <br /> provide one set of non-conflicting comments on the 100% PS&E. Budget for the meeting is <br /> included in Task 1. Kimley-Hom assumes that the Final PS&E comments will be minor in nature <br /> and that no major redesign to the horizontal and vertical geometry is included. <br /> Based on the one set of non-conflicting City comments, Kimley-Horn will finalize the construction <br /> documents, and will update the OPCC to reflect the final design. <br /> We assume 1585 hours of effort for this sub-task to develop the Final PS&E submittal, and <br /> include final revisions to the plans, specifications and cost estimate. <br /> Deliverables: <br /> • One(1)full size(24"x36"bond) set of Final PS&E to the City <br /> • Five(5) half size (11"x17"bond) sets of Final PS&E to the City <br /> • Final Technical Specifications electronically(2010 Caltrans format) <br /> • Final Opinion of Probable Construction Cost <br /> Should the City require the final construction documents be on mylar sheets, Kimley-Horn will <br /> provide the signed, mylar set at an additional cost to the City. <br /> Information Provided By Client <br /> We shall be entitled to rely on the completeness and accuracy of all information provided by the Client or <br /> the Client's consultants or representatives. The Client shall provide all information requested by Kimley- <br /> Horn during the project, including but not limited to the following: <br /> • City utility facilities(storm drainage system, water, and sewer) as-builts <br /> • City as-builts for Stanley Boulevard <br /> • <br /> Schedule <br /> We will provide our services as expeditiously as practicable with the goal of meeting the following <br /> schedule: <br /> • Task 1 -On-going for project duration (assume March through August) <br /> • Task2 -3weeks <br /> • Task 3-2 weeks for Conceptual Design <br /> • Task 4-75% Estimate-2 weeks <br /> • Task 4- 100% PS&E-5 weeks <br /> • Task 4-Final PS&E -3 weeks <br /> This schedule does not include City's plan review time and is based on timely response and delivery of <br /> background information required to perform the work. <br /> Kimley-Hom assumes all deliverables, including the Final PS&E,will be submitted to the City on or before <br /> August 31, 2015. If this delivery date is expected to change, Kimley-Hom will discuss the schedule with <br /> the City as the project progresses. <br /> , .m,e y hW o rrr-`6Oimw <br /> 6150 Stoneritlge;Mall Road,'-Swte 209, P..leasanton CA 94588 925 398484Q' <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.