My WebLink
|
Help
|
About
|
Sign Out
05
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2015
>
042115
>
05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2015 2:48:16 PM
Creation date
4/14/2015 3:42:43 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/21/2015
DESTRUCT DATE
15Y
DOCUMENT NO
5
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kimley>»Horn <br /> February 25, 2015 <br /> Adam Nelkie <br /> Senior Civil Engineer <br /> City of Pleasanton <br /> 200 Old Bernal Ave <br /> Pleasanton, CA 94566-0802 <br /> Re: Proposal—Design Services for Stanley Blvd. between Main St. and First St. <br /> Dear Mr. Nelkie: <br /> Kimley-Hom and Associates, Inc. ("Kimley-Horn" or "Consultant") is pleased to submit this letter <br /> agreement (the"Agreement") to the City of Pleasanton ("City" or"Client")for providing transportation and <br /> design engineering services for Stanley Boulevard, between Main St. and First St. Kimley-Horn will <br /> perform this Agreement pursuant to the terms and conditions set forth in the As-Needed Professional <br /> Services Agreement 13-1092C executed between the Client and Consultant on June 18, 2013. <br /> Project Understanding <br /> The proposed Stanley Boulevard project envisions to improve pedestrian, bicycle, and vehicular access <br /> on the corridor from the westerly limits at Main Street to the easterly limits at First Street. The City and <br /> Kimley-Horn design team worked together on this project from 2007-08 and progressed the design to a <br /> 90% PS&E design level. The City contacted Kimley-Horn in October 2014 to restart the project. The <br /> initial re-scoping meeting took place in late October. In early December 2014, the City provided a markup <br /> dated December 2, 2014 of the project alignment and design elements. The City and Kimley-Hom design <br /> team met on January 13, 2015 to discuss the markup, current site conditions which have changed since <br /> 2007, and new storm water regulations and City Complete Streets guidelines that will affect the design. <br /> The markup and items discussed in the meeting on January 13, 2015 will serve as the basis of design for <br /> the project moving forward. <br /> Scope of Services <br /> Kimley-Hom proposes the Scope of Services with key tasks listed below for completing the Stanley <br /> Boulevard Improvement Project, including conceptual designs and cost estimates, and PS&E <br /> construction documents. <br /> Task 1 —Project Management and Meetings <br /> Kimley-Horn will provide project management oversight of our team's activities and coordinate with the <br /> City of Pleasanton ("City") and other stakeholders throughout the project's duration. From our <br /> understanding, the design phase occurs from March thru end of August 2015. Construction is anticipated <br /> to occur between winter of 2015 thru summer of 2016. <br /> Sub-Task A:Project Coordination(Internal and External) <br /> The Kimley-Horn Project Manager and task managers will supervise, coordinate, and monitor the <br /> planning and design of the Project for conformance with standards and policies established <br /> between the City and Kimley-Hom at the beginning of the project. Kimley-Hom will coordinate <br /> with the City and other stakeholders, and with various planning and design functional groups, <br /> including our subconsultants, for the delivery of products. On an as-needed basis, subconsultants <br /> will also be included in intemal team meetings to facilitate the coordination of their services. <br /> We assume 40 hours of effort for this sub-task for the scheduled 6 month project duration. <br /> ._.," y ont 6 50 Stonendge:"Mall Road �Suite(200 Pleasanton CA 94588 925 398'4840' <br /> kimle horn corn <br />
The URL can be used to link to this page
Your browser does not support the video tag.