Laserfiche WebLink
rate has dropped and in 2014/15FY it is estimated to be 75% based on the analysis <br /> presented in Table 1. <br /> For all building permit applications, the building permit and plan review fees are based <br /> upon the cost or valuation of construction projects. Construction valuation tables are <br /> used to determine the construction value for all permits for new construction projects. <br /> For all other permits, the valuation of the project is provided by the applicant. The new <br /> construction valuation table is adjusted annually to reflect changes in the Engineering <br /> News Record (ENR) Construction Cost Index for the San Francisco Bay Area. In <br /> 2007/08FY, the new construction permits' valuation represented approximately 25% of <br /> the valuation for all permits issued by the Building Division. In 2013/14FY, new <br /> construction permits' valuation represented approximately 36.6% of all permits issued <br /> by the Building Division. New construction typically represents approximately 18% of the <br /> total valuation for all permits issued annually. <br /> Once the project's valuation is determined, either by using the new construction <br /> valuation table or by the applicant, the building permit fee table (based on the valuation) <br /> is used to determine permit fees. Upon a review of the activity cost associated with <br /> various permits and the desire to recover a portion of the Planning Division's costs that <br /> are proposed to be deferred to the building permit stage (see Planning section below), it <br /> was determined that the building permit fee table rates should be increased by <br /> approximately 35% with the minimum permit fee set at $85. Currently the minimum fee <br /> is $23.50 and does not cover the cost of staff time for issuing a permit and traveling to <br /> the jobsite to perform an inspection. <br /> Additional changes that staff is recommending, include setting permit fees for four <br /> specific permit types: kitchen and bath remodels, reroofing and swimming pools to a flat <br /> fee versus a calculated fee based on valuation. This change is warranted because there <br /> is a disparate range in valuations for these projects and the permit fees charged. Staff <br /> tested several projects and found that the staff time is the same for these types of <br /> projects no matter what the valuation of the improvements. <br /> Also, the current fee schedule requires staff to spend time to count and itemize <br /> receptacles, switches, light fixtures, plumbing fixtures, gas outlets, ducts, fans, etc. in <br /> order to calculate fees for electrical, mechanical and plumbing work. By establishing a <br /> single electrical/plumbing/mechanical permit surcharge for all combination type permits, <br /> as well as, simplifying and standardizing trade permit fees, the City can automate the <br /> fee assessment process and calculation that will eliminate any delay in the permit <br /> issuance process. <br /> In addition, the new requirements in the State Green Building and Storm Water <br /> Treatment Regulations have greatly expanded the time to both review and inspect <br /> projects subject to these standards. As such, staff is proposing new permit surcharges <br /> to cover staff time on those projects subject to these regulations. This generally effects <br /> new construction projects, large additions and large tenant improvement projects. <br /> Page 3 of 9 <br />