Laserfiche WebLink
Geotechnical Observation&Testing and Special Inspection BSK Proposal GL14-11128 <br /> Bernal Community Park Phase 2 January 11, 2015 <br /> Pleasanton,CA Page 4 <br /> Fee and assumed hour breakdown for the above scope is as follows: <br /> INSPECTIONS- DAYS HRS/DAY HOURS RATE EXTENSION <br /> Earthwork Construction <br /> Field Technician(observation) 12 8 96 $93.00 $8,928.00 <br /> Field Technician(full-time) 102 8 816 $93.00 $75,888.00 <br /> Nuclear Density Gauge Charge 102 1 102 $52.00 $5,304.00 <br /> Concrete Construction(Sltework&Foundations) <br /> Rebar/Concrete Placement Inspections 24 8 192 $98.00 $18,816.00 <br /> Masonry Construction <br /> CMU Block.Reinforcing Steel Placement 12 8 96 $98.00 $9.408.00 <br /> Grout Placement Inspections 4 8 32 $98.00 $3,136.00 <br /> Welding Observations <br /> Shop Welding Inspection 4 8 32 $98.00 $3,136.00 <br /> Field Welding Inspection 4 8 32 $98.00 $3,136.00 <br /> SUBTOTAL INSPECTION ESTIMATE $127,752.00 <br /> TESTING AND REPORTS SETS RATE EXTENSION <br /> Laboratory Testing: <br /> Concrete Compressiva Strength Tests 24 $108.00 $2,592.00 <br /> Grout Compressive Strength Tests 4 $98.00 $392.00 <br /> Mortar Compresshe Strength Tests 6 $87.00 $402.00 <br /> Compaction Curves- (4'or 6"Mold) 12 $216.00 $2,592.00 <br /> Atterberg Limits Tests 10 $175.00 $1,750.00 <br /> HMA teem Maximum Density 3 $376.00 $1,128.00 <br /> Slew Analysis of Fine 8 Coarse Aggregate(C136) 6 $144.00 $864.00 <br /> Sand Equivalent(ASTM D2419) 6 $108.00 $648.00 <br /> Reports: <br /> Final Affidavits 1 $320.00 $320.00 <br /> SUBTOTAL TESTING ESTIMATE $10,688.00 <br /> Project Management 8 Administration HOURS RATE EXTENSION <br /> Geotechnical Engineer(Site Ceeervetbns,Feld/Lab Review) 40 $165.00 $6,600.00 <br /> Registered Engineer(Review Lab a Field Date,Site Visits,Reel Affidavits) 18 $165.00 $2,970.00 <br /> Project Manager(Relit Oversights Daily Report Review) 32 $150.00 $4,800.00 <br /> Administration(Rata Recessing,Report Rep.,Field cuordbetbn) 18 $62.00 $1,116.00 <br /> SUBTOTAL ADMINISTRATION ESTIMATE $15,486.00 <br /> TTOTAL INSPECTION AND TESTING ESTIMATE $153,926.00 <br /> For the scope of work outlined above, we anticipate an estimated total fee of $153,926.00 for <br /> geotechnical construction observation, special inspections and materials testing services. Should the <br /> construction schedule or your requested site visits require a lesser or greater amount of service than <br /> that estimated herein, our fees would vary accordingly. Our fee estimate does not include a contingency <br /> for retesting or re-inspection of failing tests or unsatisfactory work by the contractor. The actual cost of <br /> our services will depend largely on the contractor's actual schedule and progress, as well as possible <br /> impacts of weather, work stoppages, and quality of material used, all of which are beyond our control. <br /> Proficient contractor performance reduces the number of test and inspection visits required, <br /> consequently resulting in lower total fees. We are not in control of such events, nor how and when <br /> construction activities are completed, and as a result, we can only approximate our estimates for your <br /> use. To account for such uncertainties, we suggest that a contingency budget of about 10 percent of <br /> the above estimated fee for construction be set aside for our services. <br /> BSK <br />