My WebLink
|
Help
|
About
|
Sign Out
01
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2015
>
040715SP
>
01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2015 2:46:00 PM
Creation date
4/1/2015 3:32:02 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/7/2015
DESTRUCT DATE
15Y
DOCUMENT NO
1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT 3 <br /> 324 Ear hart Way <br /> Livermore 9 <br /> CA 94551 <br /> P 925.315.3151 <br /> Associates F 925.315.3152 <br /> Engineer4Laboratories www.bskassociates.com <br /> Sent via email: lking @citvofpleasantonca.gov <br /> January 11,2015 BSK Proposal GL14-11128 <br /> Mr. Lorenzo King <br /> City of Pleasanton <br /> Public Works/Engineering <br /> P.O. Box 520 <br /> Pleasanton,California 94566-0802 <br /> SUBJECT: Proposal for Geotechnical Observation and Testing,and Materials Testing and <br /> Special Inspection <br /> Bernal Community Park Phase 2 <br /> Pleasanton,CA <br /> Dear Mr. King: <br /> BSK Associates (BSK) is pleased to submit this proposal to provide geotechnical observation and testing <br /> and materials testing and special inspection services during construction of the referenced project. Our <br /> services will be performed to monitor and test conformance of the geotechnical aspects of the <br /> construction operations with the foundation and grading/earthwork plans, specifications, and the <br /> geotechnical recommendations contained in the report by Miller Pacific Engineering Group' and our <br /> supplemental lette?. Our materials testing and inspection services will be performed to verify that the <br /> work is in substantial conformance to the project documents and as required by the California Building <br /> Code. <br /> We have based our construction estimate on a review of the 100% CD submittal plan seta and our <br /> previous experience with similar projects. A construction schedule is not available at this time, but it is <br /> our understanding that total project duration will be up to 14 months. <br /> 'Geotechnical Investigation,Bernal Community Park Phase 2 Improvements,Pleasanton,California,dated March <br /> 8, 2013(MPEG File No. 1569.01) <br /> 2 Supplemental Geotechnical Recommendations,Bernal Community Park Project,Pleasanton, California,dated <br /> December 22, 2014(BSK Project No.G14-004-11P). <br /> 'Plan Check Submittal dated October 29,2014 provided by Harris Design <br /> Environmental,Geotechnical,Construction Services,Analytical Testing-An Employee-Owned Company <br />
The URL can be used to link to this page
Your browser does not support the video tag.