My WebLink
|
Help
|
About
|
Sign Out
01
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2015
>
040715SP
>
01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2015 2:46:00 PM
Creation date
4/1/2015 3:32:02 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/7/2015
DESTRUCT DATE
15Y
DOCUMENT NO
1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> Mr.Lorenzo King <br /> 2/5/15 <br /> Page 4 of 6 <br /> to City.Close out and archive project files and records,including:emails,letters, <br /> reports,dailies,photos,etc. <br /> 6.o Construction Survey Services <br /> 6.01 Construction Survey <br /> Bellecci&Associates will provide construction staking services.Refer to their <br /> proposal dated 1/21/15(attached). <br /> Assumptions <br /> • Length of Construction Period:One calendar year.Estimated fees were calculated <br /> based on labor needed over a one-year construction period. <br /> • City is responsible for continuous inspection,project management,and <br /> administration of the construction contract. <br /> • All communication to the Contractor will be made by City Staff. <br /> • Recommendation of Acceptance of the Work Harris Design and its subconsultants <br /> shall act as the initial interpreter of the requirements of the contract documents and <br /> provide opinion on the acceptability of the work. Harris Design will render an opinion <br /> on all claims of City and Contractor relating to the acceptability of the work or the <br /> interpretation of the requirements of the contract documents pertaining to the <br /> execution and progress of the work. <br /> • Rejection of Work:On the basis of site observations,Harris Design will disapprove of <br /> or reject Contractor's work while it is in progress if Harris Design believes that such <br /> work will not produce a completed project that conforms generally to the contract <br /> documents or that it will prejudice the integrity of the design concept of the project <br /> as reflected in the Construction Contract Documents. <br /> • Special Inspections:Copies of all certificates of special Inspections,testing and <br /> approvals required by laws,rules,regulations,ordinances,codes,orders or the <br /> contract documents will be distributed to the City,Harris Design and the Contractor. <br /> All costs for special inspection and testing be paid by the City. <br /> Additional Services <br /> The following services have not been included in the budget but may be provided with <br /> additional compensation as mutually agreeable and specifically authorized by the City in <br /> writing. <br /> • Providing consultation regarding replacement of any work damaged by vandalism or <br /> other cause during construction,and furnishing services as may be required in <br /> connection with the replacement of such work. <br /> • Providing services made necessary by the default of the Contractor,or by major <br /> defects or deficiencies in the work of the Contractor. <br /> Landscape Archeocture ! Park&fecreaUUn Planning l Urban Oesign <br />
The URL can be used to link to this page
Your browser does not support the video tag.