Laserfiche WebLink
EXHIBIT A <br /> • Laboratories. <br /> a. Labosport Inc, Montreal, Canada +1 (514) 277-9111 <br /> b. Sports Labs USA, Seattle, WA ( 508) 259-0030 <br /> 2.08 MARKINGS <br /> A complete field lining, marking and field boundary system with team areas limits, <br /> etc. as specified in the City's Request for Proposals for the Purchase and <br /> Installation, Warranty Service and Maintenance of the Synthetic Turf for Three Multi- <br /> Use Sports Fields Being Constructed as Part of the Bernal Community Park, Phase <br /> II Construction Project shall be provided with the initial installation. Layouts shall be <br /> accurately surveyed and marked prior to installation. Prior to applying field lining, <br /> markings or field boundary, Contractor shall submit final drawings to the City <br /> depicting the size, color and location of the markings. In addition, the City and <br /> Contractor shall determine the type and amount, if any, markings that will be applied <br /> by AstroTurf as part of the turf manufacturing process as compared to markings <br /> applied on site. <br /> All lines, numbers and field markings except one-yard marks are to be tufted or <br /> inlaid with the specific colored turf. All markings shall be uniform in color, providing <br /> a sharp contrast with the turf color and shall have sharp and distinct edging. <br /> Markings shall be true and shall not vary more than 1/2" from specified width and <br /> location. <br /> Manufacturer is to guarantee that the synthetic fiber is adaptable to painted lines. <br /> Minimum Lining and Markings: All Green Field area with white, red and yellow <br /> soccer markings. <br /> PART 3 — EXECUTION <br /> 3.01 INSTALLATION <br /> A. Perform all work in strict accordance to the drawings, shop drawings and <br /> manufacturer's specifications and instructions. <br /> B. Verification: The Contractor is responsible for the inspecting, verifying and <br /> completing all installed work of this section. <br /> C. Weather Permitted Conditions: The Contractor will not perform any work if the <br /> condition for working are; <br /> 1. Ambient air temperatures are below 45 degrees F. <br /> 2. Material temperature falls below 45 degrees F. <br /> 3. Rain is forecast or falling <br /> 4. Conditions exist or are pending that will be unsuitable to the installation of the <br />