My WebLink
|
Help
|
About
|
Sign Out
01
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2015
>
040715SP
>
01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2015 2:46:00 PM
Creation date
4/1/2015 3:32:02 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/7/2015
DESTRUCT DATE
15Y
DOCUMENT NO
1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br /> D. All material shall be constructed using the C-8 resin technology. <br /> Pile Yarn Type Slit Film100% Polyethylene Fiber with <br /> /18% nylon monofilament fiber thatch <br /> layer. <br /> Yarn Denier ASTM D-1577 <br /> Yarn Breaking Strength ASTM D-2256 <br /> Yarn Melting Point ASTM D-789 <br /> Pile Height ASTM D-418 <br /> Pile Weight ASTM D-418 <br /> Total Weight ASTM D-418 <br /> Backing Perforations ASTM D-418 <br /> Tuft Bind (Without in-fill) ASTM D-1335 <br /> Tuft Bind (With in-fill) ASTM D-1335 <br /> Grab Tear Strength ASTM D-1682 <br /> Impact Attenuation ASTM D-355 <br /> Pill Burn Test ASTM D-2859 <br /> E. Maintenance and Operating Data: Submit to the City a copy of maintenance and <br /> operating data for the synthetic grass system. Provide descriptions of all <br /> equipment recommended for the maintenance, repair, citing turf and activities not <br /> recommended relative to the warranty. Include maintenance recommendations <br /> including coverings for special events, small repair procedures, minor seam <br /> repair, discussion of the precautions to be practiced, general maintenance and <br /> uses to avoid to protect the turf system. <br /> F. Site Acceptance: Upon completion of base inspection, the Contractor shall <br /> submit a letter confirming the site inspection has been performed, noting any <br /> discrepancies, problems and/or conflicts. A summary of certification of the <br /> acceptance of the base and drainage shall be submitted. <br /> 1.04 STANDARD SPECIFICATIONS FOR LAYOUT AND RULES <br /> A. All markings shall be performed using selected colors of turf materials. <br /> 1.05 FIELD SLOPE <br /> A. Each field shall be installed with a SLOPED surface. The slope of the field may <br /> not exceed a finish profile of 0.75% grade for the Base Bid. This will be <br /> maintained throughout. Any modification to this slope shall be submitted in <br /> advance to the City for final review and approval. <br /> 1.06 DELIVERY, STORAGE AND HANDLING <br /> Packing and Shipping: Deliver products in original unopened packaging with <br /> legible manufacturers' identification. All materials shall be stored in a dry place <br /> out of the direct sunlight. <br />
The URL can be used to link to this page
Your browser does not support the video tag.