My WebLink
|
Help
|
About
|
Sign Out
01
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2015
>
040715SP
>
01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2015 2:46:00 PM
Creation date
4/1/2015 3:32:02 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/7/2015
DESTRUCT DATE
15Y
DOCUMENT NO
1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br /> BERNAL COMMUNITY PARK, PHASE II All WEATHER FIELD SPECIFICATIONS <br /> PART 1 — GENERAL SYNTHETIC TURF SECTION <br /> 1.01 RELATED DOCUMENTS <br /> A. Drawings and general provisions of Contract, including General and <br /> Supplementary Conditions and Specification Sections, and the City's Request <br /> for Proposals for the Purchase and Installation, Warranty Service and <br /> Maintenance of the Synthetic Turf for Three Multi-Use Sports Fields Being <br /> Constructed as Part of the Bemal Community Park, Phase II Construction Project <br /> dated January 12, 2015, apply to the work of this Section. <br /> 1.02 DESCRIPTION OF WORK <br /> A. The work under this section includes but is not limited to the installation of the <br /> geotextile membrane, new synthetic grass system, in-fill materials, in-laid <br /> markings, perimeter termination and maintenance equipment. <br /> 1.03 SUBMITTALS <br /> A. Synthetic Grass Sample: The Contractor shall submit a 6"X9" sample of the <br /> synthetic grass and in-fill system proposed for this contract for approval of colors, <br /> in-fill, seaming materials and layout of the system prior to ordering the materials. <br /> C. Warranty: The Contractor shall submit a manufacturer's warranty listing an eight <br /> (8) year guarantee against Ultra-violent ray fading, degradation, or defects, such <br /> as excessive wear of defibrillation. The guarantee shall include and cover that <br /> the product will not decrease in pile height by more than 15%, decrease in face <br /> weight (without in-fill) by more than 20% and not exceed a G-max (force <br /> reduction) of 110 G's initially and not exceed 150 G's over the guarantee period. <br /> The Contractor is required to perform the necessary testing during a scheduled <br /> time at least one time per year during the guarantee period. The results of the <br /> testing shall be submitted to the City of Pleasanton within 30 days of each test. <br /> Failure to submit the results will serve as notice to perform such testing by the <br /> City of Pleasanton to determine the extent of the needs under this guarantee. <br /> The Contractor is required under this guarantee to supply and install all in-fill <br /> materials and synthetic grass to maintain the performance levels of this <br /> guarantee. <br /> B. Testing and Quality Control: Submit to the Project Manager a copy of the results <br /> certified by an independent testing laboratory for the following tests performed on <br /> the synthetic grass system. <br /> C. Fiber shall be Parallel Slit Film. <br />
The URL can be used to link to this page
Your browser does not support the video tag.