Laserfiche WebLink
g) Parking lot sweeping and garbage pick-up: From 6:00 a.m. to 10:00 p.m. <br /> h) Pallets and Cardboard: <br /> Pallets shall be collected and stored in an enclosure designated for the <br /> temporary storage of empty pallets located in the service area subject to <br /> approval by the Planning Division. Cardboard boxes shall be baled and hauled <br /> offsite to a recycling facility. <br /> 25. All businesses shall maintain the area surrounding their tenant space in a clean and <br /> orderly manner at all times. <br /> Construction Phasing and Management <br /> 26. Construction of the overall project may be phased. Parking, driveways, public street <br /> access, and other infrastructure requirements to match the building intensity proposed in <br /> any phase shall be reviewed and approved by the Planning Division prior to building <br /> permit(s) for each project phase or building(s) within each phase. <br /> 27. The project applicant or developer shall prepare a Construction Best Management Plan <br /> for each construction phase for review and approval by the Planning Division. The <br /> Construction Best Management Plan shall be approved before issuance of the building <br /> permit and shall include, but is not limited to, the following: <br /> a) A construction staging plan shall be designated for all materials, equipment, and <br /> vehicles including parking for construction works and personnel. <br /> b) A construction truck route shall be designated to keep all construction traffic away <br /> from nearby residential streets. Prior to construction, the construction traffic route, <br /> construction hours, and contact names and telephone numbers shall be posted on <br /> the driveway entrances, throughout the construction site, and in any construction <br /> trailer(s). <br /> c) Comprehensive traffic control measures shall be implemented, including <br /> scheduling of major truck trips and deliveries, to avoid peak travel hours. If <br /> necessary, as determined by the Traffic Engineer, proper lane closure procedures <br /> such as flagger stations, signage, cones, and other warning devices shall be <br /> implemented during construction. <br /> d) The haul route for all materials to and from this development shall be approved by <br /> the City Engineer prior to the issuance of a permit, and shall include the provision <br /> to monitor the street surfaces used for the haul route so that any damage and <br /> debris attributable to the haul trucks is identified and corrected at the expense of <br /> the project applicant or developer. <br /> e) All internal combustion engines on grading or construction equipment used shall be <br /> equipped with a muffler equal to or better than that supplied by the vehicle <br /> manufacturer. All equipment shall be maintained in good mechanical condition so <br /> as to minimize noise and air pollution from faulty engine, drive train, and other <br /> components. No muffler or exhaust system shall be equipped with cutout, bypass, <br /> or similar device intended to thwart quieting. <br /> 11 <br />