My WebLink
|
Help
|
About
|
Sign Out
03
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2015
>
031715
>
03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2015 2:42:33 PM
Creation date
3/11/2015 11:37:35 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
3/17/2015
DESTRUCT DATE
15Y
DOCUMENT NO
3
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FEHR4 PEERS <br /> 1. Foothill Road/Stoneridge Drive <br /> 2. Stoneridge Drive/1-680 Southbound Ramps <br /> 3. Stoneridge Drive/1-680 Northbound Ramps <br /> 4. Stoneridge Drive/Johnson Drive <br /> 5. Commerce Drive/Johnson Drive <br /> 6. Park and Ride Lot/Johnson Drive <br /> 7. Stoneridge Drive/Franklin Drive <br /> 8. Dougherty Road/I-580 Westbound Ramps <br /> 9. Hopyard Road/I-580 Eastbound Ramps <br /> 10. Hopyard Road/Owens Drive <br /> 11. Johnson Drive/Owens Drive(north) <br /> 12. Johnson Drive/Owens Drive(south) <br /> 13. Stoneridge Drive/Hopyard Road <br /> 14. West Las Positas Boulevard/Hopyard Road <br /> 15. Stoneridge Drive/Hacienda Drive <br /> A technical memorandum detailing the analysis assumptions, including a final list of recommended study <br /> intersections will be submitted to City staff and the project team for review and comment prior to <br /> completing the impact analysis. <br /> Task 2—Data Collection and Site Reconnaissance <br /> This scope of work assumes that we will use the most recent intersection turning movement count data <br /> available from the City, to be provided to us in Synchro files with the most current lane configurations, <br /> traffic control and traffic signal timings. We have included new peak period traffic counts at up to five <br /> intersections to capture locations that are not included in the City's database. We will conduct up to 8 <br /> hours of field reconnaissance to spot check the intersection operation parameters, including lane <br /> configurations and traffic signal timing parameters. We will review with City staff any necessary <br /> modifications to the Synchro files prior to completing the impact analysis. <br /> Task 3—Impact Analysis <br /> The intersection peak hour level of service at each study intersection will be calculated using the 2000 <br /> Highway Capacity Manual method using Synchro software. Intersection turning movement forecasting <br /> methods are discussed within each scenario. The impact analysis will be conducted for the following <br /> scenarios: <br />
The URL can be used to link to this page
Your browser does not support the video tag.