My WebLink
|
Help
|
About
|
Sign Out
08
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2015
>
030315
>
08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2015 2:37:04 PM
Creation date
2/24/2015 3:52:36 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
3/3/2015
DESTRUCT DATE
15Y
DOCUMENT NO
8
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Detailed Proposal <br /> City of Pleasanton I Water and Wastewater Rate Study <br /> Monthly Bill Comparison -Usage in CCF <br /> $70.00 <br /> $60.00 J$50.00 — <br /> $40.00 <br /> $30.00 �' --s—�-- <br /> $20.00 — <br /> $10.00 — — <br /> $0.00 <br /> 0 20 40 60 100 150 Example Bill <br /> O Present Rates $29.55 $29.55 $29.55 $32.35 $43.55 $57.55 Comparison <br /> ❑Proposed Rates $31.77 $31.77 $31.77 $34.78 i $46.82 $61.87 Graph <br /> At the conclusion of this task, HDR will provide a recommendation on the rate structure and <br /> recommended rates for adoption. The proposed rates will be developed for a maximum five-year <br /> period. HDR will also review the City's discount rates related to senior citizens and low income <br /> families as part of the overall rate design analysis. <br /> HDR will review the City's other miscellaneous water and wastewater fees and work with City <br /> staff to update these fees based on the costs associated with providing the service. This will be <br /> for fees related to the industrial waste program and other miscellaneous fees. <br /> Task 6 - Recycled Water Connection Fees <br /> Task Objective: Develop a cost-based recycled water connection fee that is legally <br /> defendable and in compliance with generally accepted methods for <br /> establishing such growth-related charges. <br /> Task Approach: • Review and determine the appropriate methodology with City staff. <br /> • Review and value the existing assets and potentially future (expansion- <br /> related) assets. <br /> • Develop a cost-based recycled water connection fee. <br /> • Develop stand-alone report on recycled water connection fees. <br /> Expected City • Identify the City's recycled water related projects from their Master <br /> Staff Support Plan or other adopted capital planning document. <br /> • Review the draft recycled water connection fees and provide as <br /> needed clarification. <br /> Deliverables: • Development of the recycled water connection fee. <br /> • Report detailing the development of the recycled water connection fee. <br /> 4-12 15007 <br />
The URL can be used to link to this page
Your browser does not support the video tag.