My WebLink
|
Help
|
About
|
Sign Out
08
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2015
>
030315
>
08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2015 2:37:04 PM
Creation date
2/24/2015 3:52:36 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
3/3/2015
DESTRUCT DATE
15Y
DOCUMENT NO
8
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.Detal led Proposal u D <br /> City of Pleasanton I Water and Wastewater Rate Study <br /> Additional Revenue Requirements Analysis Steps <br /> • Step 4 - Financial Planning Criteria: HDR will develop the revenue requirement <br /> analysis to be consistent with the City's financial policies and the financial planning <br /> criteria contained within those policies. <br /> • Step 5 - Summarize the Results and Develop Rate Transition Plan: The revenue <br /> requirement analysis is designed to provide an understanding of the total costs to <br /> operate each utility from year to year. While the analysis is very detailed, an important <br /> step is to summarize those results and findings into an easy to understand format. <br /> Results are summarized both numerically and graphically. HDR will develop summary <br /> tables for the revenue requirement analysis that should provide easy to understand <br /> findings and results. Another important element of the study is the potential need for a <br /> rate transition plan. If needed. HDR will develop a rate transition plan that may cover <br /> up to a five-year period. <br /> • Step 6 -Internal Review Meeting(s): As the study progresses, HDR will meet the City's <br /> project team to review the draft results of the water and wastewater revenue <br /> requirement analyses. The objective of these meeting(s) are to provide the City with an <br /> understanding of the overall methodology. while reviewing the various key inputs and <br /> assumptions of the analysis. In this way. City staff will clearly understand the approach <br /> and methodology used by HDR to develop the analysis, while gaining confirmation of <br /> the key inputs and assumptions. Based on input from City project team, the revenue <br /> requirements will be finalized for a final review by the project team. <br /> Task 4 - Cost of Service Analysis <br /> Task Objective: Develop an average embedded cost of service study to equitably allocate <br /> the water and wastewater revenue requirements to the various customer <br /> groups (classes of service) served by the City to meet the requirements of <br /> Proposition 218. <br /> Task Approach: • Utilize FY 15/16 data from the water wastewater revenue requirement <br /> analysis. <br /> ▪ Utilize a "cash basis" cost of service methodology. <br /> • Functionalize the data using the City's system of accounts. <br /> • Allocate the wastewater plant and cost data to cost components; <br /> volume-related, strength-related (TSS and BOD), and customer-related. <br /> • Allocate the water plant and cost data to cost components; average <br /> day, peak day, customer, and public fire protection. <br /> 15007 4J <br />
The URL can be used to link to this page
Your browser does not support the video tag.