My WebLink
|
Help
|
About
|
Sign Out
08
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2015
>
012015
>
08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2015 2:02:27 PM
Creation date
1/14/2015 12:08:11 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
1/20/2015
DESTRUCT DATE
15Y
DOCUMENT NO
8
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton Recycled Water Project <br /> CEQA Addendum <br /> `fable 2 <br /> -. . _. _ -. _ - _ - .._Proposed Projec[.Changes - _.-.- <br /> �`_,Original Proposed.Projcct__ _-Ch tnged,Project_ _ _Uifi rencei, <br /> 1 , <br /> .. <br /> Diameter' h J ) I h ) I `ill.)th ( <br /> .T- Ihase - _� �(ut (It) �(miles ( I ) _(miles ___;*(miles)_milcs')_ <br /> Phase IA-Hacienda Area ------- <br /> New Pipeline 6-16 49.100 9.3 49.820 9.4 720 0.1 <br /> Existing-Santa Rita Road 24 4.000 0.8 4.000 0.8 - - <br /> Existing-Tassajara Road 27 8,200 1.6 8.200 1.6 - - <br /> Existing-Stoncridge Drive 16 2,200 0.4 1,900 0.4 300 - <br /> Existing-Dublin Blvd&Fallon 16 - - 10,150 1.9 10,150 1.9 <br /> Subtotal 63,500 12.1 74,070 14.1 10,570 2.0 <br /> Phase 1B-Hacienda Area <br /> New Pipeline 4-16 20,700 3.9 20,700 3.9 - - <br /> New Pipeline(Santa Rita Rd.) 30 4,000 0.8 4,000 0.8 - - <br /> Subtotal 24 700 4.7 24 700 4.7 - - <br /> Phase 2 Remaining Feasible _______ <br /> Customers <br /> New Pipeline 4-16 18,800 3.6 18.800 3.6 - - <br /> Subtotal 18,800 3.6 18.800 3.6 - - <br /> West Option-Stoneridge Mall _______ <br /> Area <br /> New Pipeline 4-16 12.100 2.3 12,100 2.3 - - <br /> Subtotal 12.100 2.3 12 100 2.3 - <br /> - <br /> East Option-Staples Ranch <br /> Area <br /> New Pipeline 6-I8 10,500 2.0 10.500 2.0 - - <br /> ExistingPipeline-Stoncridge Dr. 18 2.100 0.4 2.100 0.4 - - <br /> Subtotal 12,600 2.4 12,600 2.4 - - <br /> NewPipeline-Subtotal 115,200 21.8 115,920 21.9 720 0.1 <br /> Repurposed Pipeline-Subtotal 16,500 3.1 26,350 5.0 9,850 1.9 <br /> TOTAL 131,700 24.9 142,270 26.9 10,570 2.0 <br /> I)The diameter of the pipelines for the Proposed Changed Project is the same as the Original Proposed Project. <br /> December 2014 2-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.