City of Pleasanton Recycled Water Project <br /> CEQA Addendum <br /> Maintenance procedures will include 1 or 2 existing City workers who will routinely inspect the pipeline <br /> alignment and connections for leaks and repair facilities on an as needed basis as well as conduct <br /> scheduled preventative maintenance procedures to keep the facilities in good working order. <br /> 2.4 Proposed Project Changes <br /> Since the IS/MND was adopted on September 16, 2014, the City is considering changing portions of the <br /> alignment to better coincide with design efficiencies. As a result and as shown on Table 2 below, the <br /> proposed alignment changes would result in an overall addition of 720 feet or 0.1 miles of new pipeline. <br /> In addition, the Proposed Changed Project would result in repurposing an additional 9,850 feet or 1.9 <br /> miles of existing pipelines, resulting in approximately 10,570 feet or 2.0 miles of new and repurposed <br /> pipeline. Figure 1 also shows those changes graphically on the project map. No other changes are <br /> contemplated at this time or will be covered under this addendum. <br /> December 2014 2-5 <br />