Laserfiche WebLink
City of Pleasanton Recycled Water Project <br /> CEQA Addendum <br /> described in subsection (A) occurs, a subsequent EIR or negative declaration shall only be <br /> prepared by the public agency which grants the next discretionary approval for the project, if any. <br /> In this situation no other responsible agency shall grant an approval for the project until the <br /> subsequent EIR has been certified or subsequent negative declaration adopted. <br /> (D) A subsequent EIR or subsequent negative declaration shall be given the same notice and public <br /> review as required under Section 15087 or Section 15072. A subsequent EIR or negative <br /> declaration shall state where the previous document is available and can be reviewed. <br /> As described in Chapter 3 of this Addendum, none of the conditions described in CEQA Guidelines <br /> section 15162 (which implements Public Resources Code section 21166) has occurred. Under such <br /> circumstances, CEQA Guidelines section 15164 allows for the preparation of an Addendum as described <br /> below: <br /> 15164.Addendum to an EIR or Negative Declaration <br /> (A) The lead agency or responsible agency shall prepare an addendum to a previously certified EIR if <br /> some changes or additions are necessary but none of the conditions described in Section 15162 <br /> calling for preparation of a subsequent EIR have occurred. <br /> (B) An addendum to an adopted negative declaration may be prepared if only minor technical <br /> changes or additions are necessary or none of the conditions described in Section 15162 calling <br /> for the preparation of a subsequent EIR or negative declaration have occurred. <br /> (C) An addendum need not be circulated for public review but can be included in or attached to the <br /> final EIR or adopted negative declaration. <br /> (D) The decision making body shall consider the addendum with the final EIR or adopted negative <br /> declaration prior to making a decision on the project. <br /> (E) A brief explanation of the decision not to prepare a subsequent EIR pursuant to Section 15162 <br /> should be included in an addendum to an EIR, the lead agency's findings on the project, or <br /> elsewhere in the record. The explanation must be supported by substantial evidence. <br /> 1.2 Purpose of this Addendum <br /> The purpose of this Addendum is to evaluate the proposed pipeline alignment changes as a modification <br /> to the original project analyzed in the IS/MND and to demonstrate that the Proposed changes do not <br /> trigger any of the conditions described above.Based on the analysis provided below,an Addendum to the <br /> IS/MND is the appropriate CEQA document. <br /> 1.3 Impact Terminology <br /> This Addendum uses the terminology below to describe the levels of significance of impacts that the <br /> IS/MIND concluded that Proposed Project would have. This terminology is helpful for determining how <br /> the environmental impacts, if any, of the proposed pipeline alignment changes compare to the <br /> environmental impacts described in the IS/MND. <br /> • The proposed project is considered to have no impact on a particular resource topic if the analysis <br /> concludes that it would not affect that particular resource. <br /> December 2014 1-3 <br />