My WebLink
|
Help
|
About
|
Sign Out
05
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2015
>
012015
>
05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2015 2:02:01 PM
Creation date
1/14/2015 11:55:11 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
1/20/2015
DESTRUCT DATE
15Y
DOCUMENT NO
5
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKGROUND <br /> In November 2013, City Council adopted The City of Pleasanton Recycled Water <br /> Feasibility Study, and directed staff to pursue both the environmental documentation <br /> and funding necessary to continue advancing Pleasanton's Recycled Water Program, <br /> as outlined in the aforementioned feasibility study. <br /> In response to California's current record breaking drought, in March 2014 the SWRCB <br /> approved a program providing low interest (1.0 %), 30-year loans through the Clean <br /> Water State Revolving Fund (CWSRF) to support the development of alternative water <br /> sources that will reduce the water demand from the State Water Project. <br /> To take advantage of this program, on September 2, 2014 City Council approved two <br /> resolutions indicating the City's intent to borrow an estimated $14,007,230 from the <br /> program to be used for the Pleasanton Recycled Water Project that includes bringing <br /> recycled water from the DSRSD waste water facility to the Ken Mercer Sports Park. The <br /> cost estimate used at that time was preliminary based on feasibility design concepts <br /> and as a result, there was an expectation that the cost of the project would change once <br /> project design progressed. The project is now at 100% design and the cost is now <br /> estimated at $19,875,720 which is $5,868,490 more than initial estimate. The cost <br /> difference is due to required design conditions and an anticipated increase of <br /> construction costs related primarily to market conditions. <br /> To address this issue, Section 2 of the "Reimbursement Resolution" (Attachment 1) has <br /> been amended to reflect that the principal loan amount is now $19,875,720 as <br /> compared to the $14,007,230 included in the original resolution. Other sections of the <br /> resolution remain unchanged. <br /> o In addition to the above, the state is requiring the City to amend the "Pledge and <br /> Revenue Resolution" (Attachment 2) which was also adopted on September 2, <br /> 2014, to more fully comply with program requirements. Essentially, the <br /> amendments simply clarify that as a condition of the loan, the City will pledge its <br /> water revenues in the Water Maintenance and Operating Fund as payment for <br /> any and all Clean Water Revolving Fund and/or Water Recycling Fund Program <br /> financing and that the City commits to collecting revenue to facilitate the <br /> repayment. The pledge is in the form of a lien in favor of the State Water <br /> Resources Control Board. <br /> It should also be noted that in addition to adopting the two resolutions above, program <br /> guidelines require the completion of California Environmental Quality Act documents <br /> and this process is currently underway. <br /> DISCUSSION <br /> As indicated when this matter was initially reviewed by the City Council in September <br /> 2014, staff analyzed the potential for various funding sources and has determined that <br /> the combination of availability, low interest rate and term of payback, represents the <br /> best option for funding the loan for our long term recycling water needs. <br /> Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.