My WebLink
|
Help
|
About
|
Sign Out
01
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2015
>
010615
>
01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2015 1:48:49 PM
Creation date
12/19/2014 9:46:24 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
1/6/2015
DESTRUCT DATE
15Y
DOCUMENT NO
1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Weinstein stated that the Planning Commission held a public hearing on the project on October 22, <br /> 2014. No public comment was received. The Commission recommended approval of the project on a <br /> 401 vote and modified the Conditions of Approval to add stone veneer design features and additional <br /> vegetation to those most visible elevations of the project. Staff believes that the project is compatible <br /> with surrounding uses, would not generate any adverse impacts that could not be mitigated, and is <br /> thoughtfully designed in the context of the site's irregular shape and proximity to the freeway off ramp <br /> and major entryway into the city. <br /> Councilmember Brown asked if staff received any feedback from adjacent businesses. <br /> Mr. Weinstein stated that notices were distributed to within 1,000 feet of the project site. Staff received <br /> no letters or comments of concern. <br /> Councilmember Brown said she believed Chick-fil-A's product offerings focused more on a lunchtime <br /> menu. She asked whether the mid-day traffic generated by the project could create challenges that <br /> exceed those seen in the a.m. and p.m. peak hours. <br /> Traffic Engineer Tassano acknowledged the concern, particularly as Chick-fil-A is like In & Out in that it <br /> is somewhat of a destination establishment, and explained that staff had specifically that Hexagon also <br /> collect data on mid-day volume when visiting the San Jose location. While not indicated in the report, <br /> he did speak with the engineer who drafted the report to discuss what that volume looked like in <br /> comparison to peak hours. He explained that while the project would likely generate more daytime <br /> traffic, the on street traffic is not as heavy during this time and therefore it is not expected that the <br /> project would increase congestion beyond what is seen during the peak hours. <br /> Councilmember Brown noted that the traffic study looked at the cumulative impacts within the shopping <br /> center, marrying the data obtained from the San Jose location with that of In & Out which is not open <br /> for breakfast. She requested confirmation that the cumulative impacts of the project and existing <br /> businesses within the center will not significantly increase congestion. <br /> Mr. Tassano explained that the study looked specifically at the expected travel patterns of vehicles in <br /> and out of as well as within the center. He stated that while there may be some congestion within the <br /> parking lot resulting from the parking lot, it does not extend onto the roadways. Additionally, while <br /> parking for the patrons of surrounding businesses may not be as convenient there is sufficient parking <br /> within the center to accommodate the project during all operating hours. <br /> Councilmember Narum asked if the traffic study assumes a certain level of cannibalization. <br /> Mr. Tassano said "no," it did not assume a reduction in the trip volumes for either In & Out or the nearby <br /> Taco Bell. The only adjustment made to vehicle trips was to account for people already on the roadway. <br /> Vice-Mayor Pentin asked if staff has a standard formula for cannibalization. <br /> Mr. Tassano explained that the concept is typically only applied if an economic report establishes the <br /> appropriate bases. Generally speaking, he does not reduce the number of trips in this manner because <br /> he would prefer to conservative in his estimates. <br /> Councilmember Olson said he spoke with the City Manager regarding a misrepresentation in Condition <br /> of Approval No. 65. Specifically, the graphics do not depict any landscaping along the northern <br /> elevation until year 3. He asked and Mr. Weinstein confirmed that the condition requires that <br /> landscaping be installed at the time of project construction. <br /> City Council Minutes Page 10 of 14 Dec 2,2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.