My WebLink
|
Help
|
About
|
Sign Out
SUPPLEMENTAL MATERIAL
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2014
>
121614
>
SUPPLEMENTAL MATERIAL
>
SUPPLEMENTAL MATERIAL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2015 11:36:43 AM
Creation date
12/10/2014 5:07:50 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
12/16/2014
DESTRUCT DATE
15Y
DOCUMENT NO
SUPPLEMENTAL MATERIAL
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AT <br /> December 16, 2014 Provided to the City Ni Council <br /> SUPPLEMENTAL RIAL <br /> After Distribution of Packet <br /> Dear Mayor and City Council members, Date /?7e OUP <br /> We're from one of the communities in the east side of Pleasanton, and we are the ones whom <br /> will be most impacted by the development plan that's been considered. Some of our community <br /> members have been attending the city council and task force meetings on our behalf,but some of <br /> our concerns have NOT been addressed adequately at those meetings. We want to restate our <br /> concerns (old and new), and we hope that our elected officials will take our concerns seriously as <br /> the well-being of the Pleasanton residents and the future of our generations must supersede any <br /> profit gains by some developers or individuals. <br /> Following are some of the concerns that we have brought up before (petition signed by a <br /> majority of the ironwood residents)and have not been addressed so far, in addition to some new <br /> concerns: <br /> 1) We understand that multiple options are still being considered, but we are concerned the <br /> base plan is still higher than original numbers when this all started. 1300 is a large <br /> number. Why was it presented as if 1300 is not a big deal, especially when considering <br /> the additional 345 Auf De Mar units nearby, and the remaining-4400 units from the <br /> already approved city-wide units? <br /> 2) Why was there push back and hesitation in adding specific wording about the fact that <br /> number of units is driven by infrastructure cost? The local community is NOT <br /> demanding 1300 units. The fact is that this number is calculated to satisfy infrastructure <br /> costs. If the task forces assume that everyone knows about this, why not include a clear <br /> statement on what's biggest factor for the most important aspect of the project. We <br /> appreciate the city trying to limit the number of units,but our opinion is the final number <br /> of units should be driven by least impact on the residents. If 1300 is the minimum to <br /> satisfy the infrastructure costs(which is higher than what's fair to the residents),then no <br /> units should be built. We want to know the reason behind what is driving all this <br /> building. From what we can remember,most of the residents voted on a housing cap <br /> years back, which was overturned by the state,which triggered the RHNA <br /> allocations. The city has satisfied the requirement of RHNA up to the year 2022, then <br /> why is the city going forward to approve more housing units before then? A previous <br /> working draft of the EPSP indicated building would start 2016/2017? <br /> 3) If we all understand that the main driving force is the infrastructure cost, we urge city <br /> council member make sure that the task force do its due diligence in means/options to <br /> lower the infrastructure cost hence the total number of units, for example,how would the <br /> pass of measure BB affect the public funding for the extension of El Charro Road? <br /> 4) We understand that 10 options would be submitted for EIR studies, and we urge the city <br /> council members to request a thorough impact study of the traffic and schools for people <br /> across the city, not just during the PM peak hour but also morning rush hours, which has <br />
The URL can be used to link to this page
Your browser does not support the video tag.