Laserfiche WebLink
Subtask 9.1 —Draft SP review by 3 commissions (l meet. ea.) 28 hrs. $4,340 <br /> Subtask 9.2 —SP/EIR Council adoption (I meeting) 12 hrs. $1,860 <br /> Final Specific Plan document production* 12 hrs. $1,860 <br /> Part 2 on-goingConsultin.Team management* __.._40.hrs. ._36,200 <br /> 158 hrs. $24,490 <br /> TOTAL OF PARTS 1 AND PART 2 269 hrs. $41,695 <br /> ASSUMPTIONS <br /> • The above proposal includes the following assumptions: <br /> 1. The TF will forward the Preliminary Draft EPSP to the neighborhood/community <br /> meeting process without further edits. <br /> 2. No additional economic analysis reports will prepared for the remainder of the <br /> Specific Plan process. <br /> 3. RPI will not participate in the"neighborhood meeting series." <br /> 4. Only the public meetings noted above are assumed for cost estimating. <br /> 5. Any additional work, studies, plans,public meetings, etc. requested by City staff <br /> beyond that specified above is to be compensated by the City on a time-and- <br /> materials basis. <br /> Note: <br /> * The current EPSP contract assumes either no or limited RPI assistance in this task. <br /> However, based upon recent discussions with City staff, it is now anticipated that RPI <br /> services will be desired. <br /> Wayne Rasmussen, President <br /> RASMUSSEN PLANNING, INC. <br /> 2 <br />