My WebLink
|
Help
|
About
|
Sign Out
03
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2014
>
121614
>
03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2015 11:37:25 AM
Creation date
12/10/2014 11:14:39 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
12/16/2014
DESTRUCT DATE
15Y
DOCUMENT NO
3
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
citations, and/ or stop work orders. <br /> c. The project developer is responsible for implementing the following <br /> BMPs. These, as well as any other applicable measures, shall be <br /> included in the SWPPP and implemented as approved by the City. <br /> i. The project developer shall include erosion control/stormwater <br /> quality measures on the project grading plan which shall specifically <br /> address measures to prevent soil, dirt, and debris from entering the <br /> public storm drain system. Such measures may include, but are <br /> not limited to, hydroseeding, hay bales, sandbags, and siltation <br /> fences and shall be subject to the review and approval of the City <br /> Engineer/Chief Building Official. If no grading plan is required, <br /> necessary erosion control/stormwater quality measures shall be <br /> shown on the site plan submitted for a building permit, and shall be <br /> subject to the review and approval of the Building and Safety <br /> Division. The project developer is responsible for ensuring that the <br /> contractor is aware of and implements such measures. <br /> ii. All cut and fill slopes shall be revegetated and stabilized after <br /> completion of grading, but in no case later than October 15. <br /> Hydroseeding shall be accomplished before September 15 and <br /> irrigated with a temporary irrigation system to ensure that the <br /> vegetated areas are established before October 15. No grading <br /> shall occur between October 15 and April 15 unless approved <br /> erosion control/stormwater quality measures are in place, subject to <br /> the approval of City Engineer/Chief Building Official. Such <br /> measures shall be maintained until such time as permanent <br /> landscaping is in place. <br /> iii. Gather all sorted construction debris on a regular basis and place in <br /> the appropriate container for recycling; to be emptied at least on a <br /> weekly basis. When appropriate, use tarps on the ground to collect <br /> fallen debris or splatters that could contribute to stormwater runoff <br /> pollution. <br /> iv. Remove all dirt, gravel, rubbish, refuse, and green waste from the <br /> street pavement and storm drains adjoining the site. Limit <br /> construction access routes onto the site and place gravel on them. <br /> Do not drive vehicles and equipment off paved or graveled areas <br /> during wet weather. Broom sweep the street pavement adjoining <br /> the project site on a daily basis. Scrape caked on mud and dirt <br /> from these areas before sweeping. <br /> v. Install filter materials (such as sandbags, filter fabric, etc.) at the <br /> storm drain inlet nearest the downstream side of the project site in <br /> PUD-100 Chick-fil-A <br /> Conditions of Approval (Planning Commission) Page 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.