My WebLink
|
Help
|
About
|
Sign Out
05
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2014
>
120214
>
05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2015 11:33:11 AM
Creation date
11/24/2014 4:48:08 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
12/2/2014
DESTRUCT DATE
15Y
DOCUMENT NO
5
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
prior to the issuance of a building permit; and 2) prior to final inspection. The <br />verification shall be provided to the Planning Division. <br />21.The State of California's Green Building Standards Code, "CALGreen ", as <br />amended, shall apply to the project, as applicable. <br />Building <br />22.The building(s) covered by this approval shall be designed and constructed to the <br />Title 24 Building Standards, including Building, Electrical, Mechanical, Plumbing, <br />Energy, Fire, Green Building and both State and Federal accessibility <br />requirements in effect and as amended by the City of Pleasanton at the time of <br />Building Permit submittal. <br />23.AII Building and Fire permit plans, including demolition, on -site, building shell and <br />tenant improvements shall be submitted to the Building and Safety Division for <br />review and approval. <br />Traffic Engineering <br />24.The applicant or responsible party shall pay any traffic impact fees for the subject <br />use as determined by the City Traffic Engineer. This includes both the <br />Pleasanton Traffic Impact Fee and the Tri- Valley Transportation Fee. These fees <br />shall be paid prior to issuance of a building permit. <br />25.AII new parking spaces shall conform to the City standard parking dimensions. <br />Plans submitted to the Building Division for permits shall have the dimensions <br />clearly noted on the plans. <br />26. The developer shall submit a comprehensive traffic control plan prior to issuance <br />of a Building Permit for review by the City Traffic Engineer. The plan shall <br />include scheduling of major truck trips and deliveries, to avoid peak travel hours, <br />lane closure procedures such as flagger stations, signage, cones, and other <br />warning devices that will be implemented during construction. <br />Engineering <br />27.AII utility lines shall be installed in conduit. Only PG &E switch enclosures or <br />capacity banks can be installed above ground provided the units are screened <br />with landscaping to the satisfaction of the Director of Community Development. <br />Building <br />28. In accordance with the Fats, Oils and Grease (FOG) Program, all sinks and wash <br />basins in the convenience store (excluding those located inside the restrooms) <br />shall be plumbed to a grease trap. The grease trap(s) shall be installed in an <br />PUD -102 3192 Santa Rita Road <br />Conditions of Approval Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.