My WebLink
|
Help
|
About
|
Sign Out
05
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2014
>
120214
>
05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2015 11:33:11 AM
Creation date
11/24/2014 4:48:08 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
12/2/2014
DESTRUCT DATE
15Y
DOCUMENT NO
5
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c) No oil, gasoline, chemicals, or other harmful materials shall be deposited or <br />disposed within the dripline of the trees to be saved or in drainage <br />channels, swales, or areas that may lead to the dripline. <br />d) No stockpiling /storage of fill, etc., shall take place underneath or within five <br />feet of the dripline of the existing trees to be saved. <br />47. Prior to issuance of a grading or building permit, the project developer shall <br />install a temporary six foot tall chain -link fence (or other fence type acceptable to <br />the Director of Community Development) outside of the existing tree drip lines, <br />unless otherwise approved by the Director of Community Development. The <br />fencing shall remain in place until final landscape inspection of the Community <br />Development Department. Removal of such fencing prior to that time may result <br />in a "stop work order." <br />Building <br />48. Prior to issuance of building or demolition permits, the applicant shall <br />submit a waste management plan to the Building and Safety Division. The plan <br />shall include the estimated composition and quantities of waste to be generated <br />and show how the project developer intends to recycle at least 75 percent of the <br />total job site construction and demolition waste measured by weight or volume. <br />The proposed plan must be approved by the Building Division prior to any <br />building permit inspections. Proof of compliance shall be provided to the Chief <br />Building Official prior to the issuance of a final building permit. During demolition <br />and construction, the project developer shall mark all trash disposal bins "trash <br />materials only" and all recycling bins "recycling materials only." The project <br />developer shall contact Pleasanton Garbage Service for the disposal of all waste <br />from the site. <br />49.At the time of building permit plan submittal, the project developer shall submit a <br />final grading and drainage plan prepared by a licensed civil engineer depicting all <br />final grades and on -site drainage control measures to prevent stormwater runoff <br />onto adjoining properties. <br />Engineering <br />50.A "Conditions of Approval" checklist shall be completed and attached to all plan <br />checks submitted for approval indicating that all conditions have been satisfied. <br />51. The haul route for all materials to and from this development shall be approved <br />by the City Engineer prior to the issuance of a permit. <br />52.AII dry utilities (electric power distribution, gas distribution, communication <br />service, Cable television, street lights and any required alarm systems) required <br />to serve existing or new development shall be installed in conduit, underground <br />PUD -102 3192 Santa Rita Road <br />Conditions of Approval Page 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.