Laserfiche WebLink
Table 1 below summarizes the changes to the proposed project since the September 2013 <br /> work session. <br /> Table 1: Changes to the Project Proposal Since September 2013 <br /> September 25, 2013 1 Current Proposal <br /> Hours of 24 Hours 5:00 a.m. — 1 :00 a.m. <br /> Operation Employees allowed to be on site <br /> between 1:00 a.m.- 5:00 a.m. <br /> Type of Market 7-Eleven store with snack, food and No change <br /> drinks with the sale of alcoholic <br /> beverages <br /> Drive-Thru 7:00 a.m. — 10:00 p.m. No change <br /> Carwash - <br /> Existing Gas 5:00 a.m. — 12:00 midnight 5:00 a.m. — 1:00 a.m. <br /> Station (existing) <br /> Parking Stalls 17 16 <br /> Tree Removal Remove one tulip tree, and possibly Remove one tulip tree and two <br /> _ retain all other trees on site _ redwood trees <br /> Car Wash None An eight-foot tall fence and Quiet <br /> Noise Mitigation Dryer to mitigate noise from the <br /> proposed carwash <br /> Bicycle Rack None Two <br /> The proposed PUD rezoning and development plan application is subject to review and <br /> approval by the City Council, following review and recommendation by the Planning <br /> Commission. The Planning Commission normally reviews and takes final action on <br /> Conditional Use Permit applications. However, since the subject Conditional Use Permit is an <br /> integral part of the PUD application, staff believe that the Council should also take final action <br /> on the Conditional Use Permit application. <br /> Site Plan <br /> The proposed convenience market would replace the existing automobile service use in the <br /> building. The drive-through carwash would be located on the east side of the convenience <br /> market with vehicles entering the carwash on the north side of the building and exiting on the <br /> south side. The new trash enclosure would be constructed to the northeast of the convenience <br /> market. The existing parking spaces along the north side would remain. New parking spaces <br /> would be provided on the north and south sides of the building. <br /> The project site currently has a total of 17 on-site parking stalls; 16 on-site parking spaces are <br /> proposed as part of the project. The existing parking spaces located along the northern <br /> property line facing W. Las Positas Boulevard and along the eastern property line facing the <br /> adjoining shopping center would remain except for one parking stall at the east side. which <br /> would be removed to accommodate a walkway and two bicycle racks. The parking spaces <br /> located to the south of the existing building would be removed except for one accessible <br /> parking stall to accommodate the drive aisle for the drive-through carwash. Three parking <br /> - <br /> PUD-102/P14-0014 Planning Commission <br /> Page 7 of 26 <br />