My WebLink
|
Help
|
About
|
Sign Out
05
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2014
>
100714
>
05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2015 1:43:44 PM
Creation date
9/30/2014 4:13:33 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/7/2014
DESTRUCT DATE
15Y
DOCUMENT NO
5
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sufficient buffering between development subsurface construction <br /> and the location of resources. <br /> iii. Excavation/Removal: The archaeological consultant shall excavate <br /> and recover the cultural resources as described above and remove <br /> artifacts as necessary. However, due to the depth of development <br /> excavation, the site would be permanently disturbed. <br /> If the City requires data recovery, the archaeological consultant shall first <br /> prepare an Archaeological Data Recovery Plan that s/he shall submit to the <br /> Director of Community Development for review and approval. <br /> If development plans call for trenching within 200 feet of the Arroyo Mocho, a <br /> program of subsurface mechanical trenching along the impacted route <br /> shall precede project trenching in an attempt to locate additional <br /> archaeological sites and/or the original meander of the Mocho, where such <br /> sites would most likely be. If additional sites were to be found, the project <br /> developer shall adhere to the above mitigation measures. <br /> If human remains are discovered, the project developer shall contact the <br /> County Coroner immediately. If the coroner determines that the human <br /> remains are Native American remains, the project developer shall notify the <br /> California State Native American Heritage Commission. <br /> The archaeological consultant shall prepare a Final Archaeological Resources <br /> Report, meeting City and state standards, evaluating the historical importance <br /> of the archaeological resource and describing the archaeological and <br /> historical research methods employed in the testing, monitoring, and <br /> data recovery programs. The Director of Community Development shall <br /> review and approve this document. The project developer shall file the report <br /> with appropriate state offices. <br /> 96. In accordance with measure UT-1, plans submitted to the Building and Safety <br /> Division for plan check shall incorporate low-flow irrigation head and/or drip <br /> irrigation with electric controllers set to water after 7:00 p.m. and before 10:00 <br /> a.m., and property soil preparation for landscaped areas that includes a minimum <br /> of two inches of mulch and two inches of organic soil amendment, as <br /> recommended by a qualified landscape architect. <br /> 97. If it is determined through field inspections and/or monitoring that a site is not in <br /> compliance with an EIR mitigation/improvement measure, the responsible party <br /> for implementation of the mitigation/improvement measure is the responsible <br /> party to bring the mitigation/improvement measure into compliance. The <br /> responsible party is listed in the EIR Mitigation Monitoring and Reporting Plan. <br /> The City of Pleasanton may require the responsible party to conduct a peer <br /> review report by a consultant chosen by the City of Pleasanton to determine <br /> compliance and to recommend measures to correct noncompliance. All peer <br /> PUD-106, Chrylser-Jeep-Dodge Page 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.