Laserfiche WebLink
The site development plan shall include all required information to design and <br />construct site, grading, paving, drainage, and utilities. <br />177. The project developer shall post address numerals on the building so as to be <br />plainly visible from all adjoining streets or driveways during both daylight and <br />night time hours. <br />178. The building covered by this approval shall be designed and constructed to meet <br />Title 24 state energy requirements. <br />179. All building and /or structural plans must comply with all codes and ordinances in <br />effect before the Building and Safety Division will issue permits. <br />Bicycle Parking <br />180. The project shall provide a minimum bicycle parking equivalent to 5% of the total <br />number of automobile parking spaces. The maximum required bicycle parking <br />spaces is 20. Prior to the installation, the applicant/developer shall submit the <br />design and location of the bicycle racks to the Director of Community <br />Development for review and approval. Bicycle racks shall: <br />a) Be visible and accessible <br />b) Support the frame of the bicycle and not just one wheel <br />c) Allow the frame and one wheel to be locked to the rack <br />d) Allow the use of either a cable or U- shaped lock <br />e) Be securely anchored <br />f) Be usable by bikes with no kickstand <br />g) Be usable by a wide variety of sizes and types of bicycles. <br />URBAN STORMWATER CONDITIONS <br />181. The project shall comply with the City of Pleasanton's Stormwater NPDES Permit <br />#CAS612008, dated October 14, 2009 and amendments (hereafter referred to as <br />NPDES Permit). This NPDES Permit is issued by the California Regional Water <br />Quality Control Board, San Francisco Bay Region (hereafter referred to as <br />Regional Water Quality Control Board). Information related to the NPDES Permit <br />is available at the City of Pleasanton Community Development Department, <br />Engineering Division, and on line at: <br />• http: / /www.ci.pleasanton.ca.us/ business /planning /StormWater.html <br />• http:// www. waterboards .ca.aov /sanfranciscobav /water issues /programs /stormwater /Municipal /i <br />ndex.shtml <br />A. Design Requirements <br />1. NPDES Permit design requirements include, but are not limited to, the following: <br />a. Source control, site design, implementation, and maintenance standards <br />when a regulated project (such as a commercial and industrial project) <br />PUD -106, Chrylser- Jeep -Dodge Page 33 <br />