My WebLink
|
Help
|
About
|
Sign Out
11
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2014
>
091614
>
11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2015 4:58:52 PM
Creation date
9/10/2014 4:57:32 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/16/2014
DESTRUCT DATE
15Y
DOCUMENT NO
11
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
47. Unless otherwise shown on the approved PUD landscape plan, all trees used in <br />landscaping be a minimum of 24" box in size and all shrubs a minimum of five (5) <br />gallons. <br />48. A final landscape and irrigation plan shall be submitted to and approved by <br />Director of Community Development as part of the building permit plan set prior <br />to issuance of a building permit. Said landscape plan shall be detailed in terms <br />of species, location, size, quantities, and spacing. Plant species shall be of <br />drought - tolerant nature and the irrigation design shall utilize low- volume drip, <br />bubbler, or other water conserving irrigation systems to the maximum extent <br />possible. Irrigation system shall meet all requirements for compatibility with <br />recycled water supply per City of Pleasanton Recycled Water Standards. <br />49. The State of California's Green Building Standards Code, "CALGreen ", shall <br />apply to the project, if applicable. <br />50. Appliances meeting Energy Star standards shall be installed as part of the <br />project. The proposed appliances shall be indicated on the plans submitted to <br />the Building and Safety Division for the issuance of a building permit. <br />51. Energy efficient lighting shall be installed for the building. The energy efficient <br />lighting shall be shown on the plans submitted for the issuance of a building <br />permit. <br />52. The proposed building shall be constructed to allow for future installation of a <br />Photovoltaic (PV) system. The project/building developer shall comply with the <br />following requirements for making the building photovoltaic- ready. Making the <br />building photovoltaic -ready shall require the following measures to be <br />implemented with the construction of the structure: <br />a. Electrical conduit and cable pull strings shall be installed from the roof /attic <br />area to the building's main electrical panels: <br />b. An area shall be provided near the electrical panel for the installation of an <br />"inverter" required to convert the direct current output from the photovoltaic <br />panels to alternating current: and <br />c. These measures shall be shown on the building permit plan set submitted to <br />the Director of Community Development for review and approval before <br />issuance of the building permit. <br />53. Water conservation devices shall be installed as part of the project. The water <br />conservation devices shall be stated on the plans submitted for the issuance of a <br />building permit. <br />54. Any excess soil from the site shall be off - hauled from the site and disposed of in <br />a lawful manner. No temporary stockpiling of dirt on this site shall occur without <br />specific review and approval by the Planning Division. <br />PUD -106, Chrylser- Jeep -Dodge Page 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.