My WebLink
|
Help
|
About
|
Sign Out
06
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2014
>
090214
>
06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2015 4:55:45 PM
Creation date
8/28/2014 11:38:43 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/2/2014
DESTRUCT DATE
15Y
DOCUMENT NO
6
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKGROUND <br /> The Wastewater Master Plan, 2007 identified the Stoneridge Mall Bypass project to be <br /> a medium-term project to construct 850 feet of 8 inch pipeline bypassing the existing <br /> Stoneridge Mall sewer between Canyon Way to near Deodar Way. Subsequent <br /> development and improvements on other sections of the existing sewer servicing the <br /> Stoneridge Mall area have reduced the project scope. The existing sewer servicing the <br /> Stoneridge Mall area circles the entire mall under Stoneridge Mall road with the <br /> exception of 202 linear feet. There are two separate connections to the main trunk line <br /> sewer servicing the Stoneridge Mall area but the existing sewer around the mall was not <br /> interconnected. <br /> The project installed the missing 202 feet of sewer main providing a completed loop <br /> around the Stoneridge Mall, interconnecting the two outlets to the trunk line sewer. The <br /> installation of the bypass line provides redundancy to the sewer system to prevent and <br /> reduce any potential sewer overflows. The project also provides greater flexibility to <br /> maintain and service the existing sewer line. <br /> DISCUSSION <br /> The construction contract for this project was awarded to Sanact, Inc. dba Roto-Rooter <br /> on April 15, 2014 for the amount of$42,000. One change order was issued, providing a <br /> credit to the City of $156 for an after hours callout to secure the work site. All of the <br /> contract work has been completed to the City's satisfaction. This project is now <br /> complete and staff recommends City Council acceptance. <br /> Submitted b • Fiscal Review: Approve by: <br /> • <br /> F Brian D an Emily kgner Nelson Fialho <br /> Director of Director of Finance City Manager <br /> Community Development <br /> Attachments: <br /> 1. Funding and Expenditure Summary <br /> Page 2 of 2 <br />