My WebLink
|
Help
|
About
|
Sign Out
21
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2014
>
081914
>
21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2015 4:39:43 PM
Creation date
8/12/2014 2:29:00 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
8/19/2014
DESTRUCT DATE
15Y
DOCUMENT NO
21
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
35. The project developer acknowledges that the City of Pleasanton does not <br /> guarantee the availability of sufficient sewer capacity to serve this development <br /> by the approval of this case, and that the project developer agrees and <br /> acknowledges that building permit approval may be withheld if sewer capacity is <br /> found by the City not to be available. <br /> 36. This approval does not guarantee the availability of sufficient water to serve the <br /> project. The City shall withhold building permits for the project if at the time <br /> building permits are applied for, mandatory water rationing is in effect, unless the <br /> City has adopted a water offset program and unless the project developer is <br /> participating in the program. Notwithstanding the project developer's <br /> participation in such a program, the City may withhold building permits if the City <br /> determines that sufficient water is not available at the time of application of <br /> building permits. <br /> Planning Requirements: <br /> 37. The project developer shall survey the building pad heights to verify their <br /> conformance to the approved building pad elevations on Exhibit 'A°. Said <br /> verification shall be performed by a licensed land surveyor or civil engineer, and <br /> shall be completed and provided to the Planning Department before the building <br /> foundations/slabs are formed. <br /> 38. The project developer shall survey the heights of the structures to verify their <br /> conformance to the approved building height as shown on Exhibit °A". Said <br /> verification shall be performed by a licensed land surveyor or civil engineer, and <br /> shall be completed and provided to the Planning Department before the first <br /> framing or structural inspection of each building on each lot by the Building and <br /> Safety Division. <br /> 39. The homes covered by this approval shall be constructed to encourage <br /> telecommuting by providing as an option telecommunications infrastructure <br /> consistent with state-of-the-art methods at the time that the homes are submitted <br /> for site-specific design review approval. <br /> 40. A list of all green building measures used in the design of the home(s) shall be <br /> provided for the review and approval of the Planning Director with the application <br /> for design review approval for the home(s). Each home shall be designed to <br /> include a minimum of 50 points using the ACWMA's Green Points rating system <br /> with a minimum of ten points in each category (Resources, Energy, and <br /> IAQ/Health). <br /> 41. The project developer shall submit a waste management plan to the Building and <br /> Safety Division prior to issuance of building or demolition permits. The plan shall <br /> include the estimated composition and quantities of waste to be generated and <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.