My WebLink
|
Help
|
About
|
Sign Out
10
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2014
>
081914
>
10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2015 4:38:01 PM
Creation date
8/12/2014 2:14:31 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
8/19/2014
DESTRUCT DATE
15Y
DOCUMENT NO
10
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKGROUND <br /> This project consists of installing a five foot wide sidewalk along the south shoulder of <br /> Bemal Avenue from Foothill Road to West Lagoon Road. Work will include widening <br /> the shoulder; installing asphalt berm, paving, metal guard rail, 170 LF of hand rail and <br /> approximately 3,500 SF of sidewalk; and making utility adjustments as shown on project <br /> plans. <br /> DISCUSSION <br /> Budget <br /> Alameda County Transportation Commission (Alameda CTC) has begun implementing <br /> the Time of Use policy for Measure B funding. Staff identified two Bicycle and <br /> Pedestrian projects (Hopyard and Golden Intersection Improvements, as well as Bernal <br /> Avenue Sidewalks— Foothill to West Lagoon)that are priorities to address safety <br /> concerns that could be designed and under construction in the time frame to meet the <br /> Time of Use Policy for some older Measure B funding. Design began under CIP <br /> No. 135043 to utilize the Measure B funds in conformance with the Alameda CTC <br /> requirements. Staff recommends that the contingency amount for this project be set at <br /> 10% of the construction contract. <br /> Bids <br /> The engineer's estimate for the project was calculated at $95,000. Sealed bids were <br /> opened on July 24, 2014. Five bids were received that ranged from $136,060 to <br /> $210,830 (see Attachment 1). The low bid was received from Rosas Brothers <br /> Construction of Oakland, California. All bid documents were found to be in order and <br /> past work performed by Rosas Brothers Construction was verified to be satisfactory. <br /> Staff recommends award of the construction contract to Rosas Brothers Construction. <br /> Schedule <br /> The proposed schedule for the project is as follows: <br /> Approval of Plans and Specifications/Award of Contract August 19, 2014 <br /> Start of Construction October 2014 <br /> End of Construction November 2014 <br /> Submitted by: Fiscal Review: Approved b : <br /> 132--; rhAdo-60eirtel <br /> Brian Dolan Emily Wagner Nel•on ialho <br /> Director of Director of Finance City Manager <br /> Community Development <br /> Attachments: <br /> 1. Bid Summary <br /> 2. Funding and Estimated Expenditures Summary <br /> 3. Location Map of Bernal Avenue Sidewalk Improvements <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.