My WebLink
|
Help
|
About
|
Sign Out
09
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2014
>
081914
>
09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2015 4:37:47 PM
Creation date
8/12/2014 2:13:33 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
8/19/2014
DESTRUCT DATE
15Y
DOCUMENT NO
9
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ASSUMPTIONS IN PREPARATION OF PROPOSAL <br /> In order to complete our work the following shall be provided by client: <br /> 1. We require access to all project reports,aerial photos and maps relating to the site's <br /> environmental resources in order to provide the described scope of services in an efficient <br /> manner.It is assumed that Client will provide all necessary base maps,site plans,and <br /> grading plans. <br /> • <br /> 2. Free access to site,even during night hours and periods of rain. <br /> 3. After the Client has been notified,within a reasonable time period,we are obligated to <br /> report findings or rare,threatened or endangered plant and animal species to the California <br /> Natural Diversity Data Base(CNDDB). <br /> 4. Engineer or planner shall prepare all grading,site and other plans,and final graphics. <br /> 5. The client or other project team members shall provide CEQA or NEPA documents, <br /> planning,engineering,geotechnical,hazardous waste,and cultural resources. <br /> 6. Subsurface investigations,including soil testing, are not included. <br /> 7. The provided scope of work is all-encompassing and complete. Related services not <br /> included in this scope of work include,but are not limited to, focused wildlife or plant <br /> surveys,hydrological analyses,extensive agency negotiations, attendance at any <br /> meetings other than those described,completion or review of any CEQA or NEPA <br /> documentation, additional client or agency coordination,presentations,or attendance at <br /> public hearings. <br /> 8. We make no guarantees,express or implied,regarding final approval or acceptance by <br /> agencies of survey results,project plans or mitigation measures. <br /> City of Pleasanton/proposal extended monitoring<P 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.