Laserfiche WebLink
EXHIBIT "A-2°° <br /> __.1 <br /> / Y+. <br /> 1.� <br /> MOSAIC ASSOCIATES tIc <br /> 1690 San Pablo Avenue,Suite D.Pinole,CA 94564.510.964.0394 <br /> December 13,2013 <br /> Huy Ho <br /> Associate Civil Engineer <br /> City of Pleasanton <br /> P.O. Box 520 <br /> Pleasanton,CA 94566-0802 <br /> Proposal for Change Order for Project No.995067: Extended Period of Riparian Tree <br /> Monitoring(Years 7,9 and 10)and Preparation of Long-term Management Plan for <br /> Mission Creek Mitigation Area,Bernal Bridge at Arroyo del Valle and Mission Creek, <br /> Pleasanton <br /> Dear Huy: <br /> Thank you for the opportunity to present this proposal for a change order to our existing contract <br /> for mitigation monitoring and reporting service for the Bernal Bridge at Arroyo del Valle and <br /> Mission Creek sites. <br /> This proposal coven the services detailed below. <br /> Services <br /> • Extended monitoring and reporting for riparian trees at the Mission Creek and Arroyo del <br /> Valle mitigation areas during years 7, 9 and 10,as required by the RWQCB 401 <br /> certification for the project. <br /> • Preparation of a long-term maintenance manual for the Mission Creek mitigation area. <br /> Exclusions <br /> • Permitting or mitigation planning services. <br /> • Mitigation monitoring services beyond those described herein. <br /> • Botanical,wildlife or wetland surveys. <br /> • Legal or land title services. <br /> Our proposed budget is attached in Table 1. <br /> City of Pleasanton/proposal extended monitoring&LTP 1 <br />