My WebLink
|
Help
|
About
|
Sign Out
21
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2014
>
071514
>
21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2015 4:31:56 PM
Creation date
7/9/2014 1:45:49 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
7/15/2014
DESTRUCT DATE
15Y
DOCUMENT NO
21
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The project developer shall Implement Comment 1 b of the Cotton/Shires letter- <br /> provide an analysis of storm drainage impacts to the proposed building pads - <br /> with the tentative subdivision map application. <br /> 21. The project developer's geotechnical consultant shall review and approve all <br /> foundation, retaining wall, and drainage geotechnical aspects of the final <br /> development plans to ensure that the recommendations have been properly <br /> incorporated into the development. The consultant shall certify by writing on the <br /> plans or as otherwise acceptable to the Director of Building Inspection that the <br /> final development plan is in conformance with the geotechnical report approved <br /> with the project. <br /> 22. The project developer shall annex this development and the open-space area to <br /> be deeded to the City to the Lemoine Ranch Geologic Hazard Abatement District <br /> (CHAD). The project developer shall be responsible for preparing all necessary <br /> documentation to annex to the Lemoine Ranch GHAD including any expenses of <br /> the City's geotechnical engineer for the CHAD. The project developer shall be <br /> responsible for paying a catch-up payment to the GRAD assessments and any <br /> expenses of the City's geotechnical engineer prior to the approval of the final <br /> map. Upon recordation of the final subdivision map, the project developer and/or <br /> lot owners shall be responsible for paying the future annual GHAD assessments <br /> for the development and the public open-space area. <br /> 23. At the tentative map stage,the applicant shall work with staff to reduce the height <br /> of the slope banks on the west side of Lot 6 and on the south side of Lot 7 facing <br /> the proposed Public Street and Old Foothill Road. Measures such as using <br /> additional, lower retaining walls and/or split pads shall be considered. <br /> 24. At the tentative map stage, staff shall discuss the means to permanently <br /> preserve the open space area, and shall make a recommendation to the <br /> Planning Commission. <br /> 25. With the first construction phase, the project developer shall construct the public <br /> infrastructure including the street and cul-de-sac, mass grading for the lots, bio- <br /> retention pond/swales, perimeter landscaping in the open space area, the shared <br /> access driveways, and all entry landscaping along Foothill Road, Old Foothill <br /> Road, and Austin Place. The applicant shall work with Parks and Community <br /> Services staff to design a coordinated entry landscape plan for the development <br /> and the Alviso Adobe Park, and shall install such landscaping. <br /> 26. With the application for the tentative subdivision map, the project developer shall <br /> submit the following: <br /> a. An updated tree analysis for the eight-lot portion of this development; and, <br /> b. A mitigation plan showing the location of protective fencing for the trees, <br /> swales, seeps, etc. <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.