Laserfiche WebLink
1.Project Description and Approach <br /> Project Approach <br /> Based on our review of the Request for Proposals, we have put together a <br /> scope of work that we believe responds to the City's objectives. This scope <br /> details the tasks that ESA proposes to complete and deliver a Supplemental <br /> EIR Environmental Impact Report(SEIR),which would focus in on three <br /> key environmental issue areas,and would be tiered from the 2009 General <br /> Plan EIR and the 2011 GPA EIR. <br /> The City,as Lead Agency,may prepare a supplement to an EIR if only <br /> minor additions or changes would be necessary to make the previous EIR <br /> adequately apply to the project in the changed situation. The SEIR need only <br /> present the information necessary to make the previous EIR adequate for the <br /> project as revised. Thus, for purposes of the current SEIR,the project will <br /> consist of further amendments to the Pleasanton General Plan,previous <br /> amendments to which were analyzed in the GPA EIR. <br /> The SEIR will be given the same kind of notice and public review as is given <br /> to a Draft EIR(CEQA Guidelines Section 15087), and may be circulated by <br /> itself without re-circulating the previous Draft or Final EIR. However,when <br /> the City decides whether to approve the proposed project,the decision- <br /> making body shall consider the previous EIR as revised by the SEIR. A <br /> finding under Section 15091 shall be made for each significant effect shown <br /> in the previous EIR as revised. <br /> Task 1. Project Initiation and Site Visit <br /> In addition to meeting with City staff for a project kick-off meeting, ESA <br /> will review the Administrative Draft General Plan Amendment and Zoning <br /> Amendment, as provided by the City, and will request data vital to the <br /> project in electronic format, including but not limited to,any updated <br /> information concerning ongoing investigation and remediation of <br /> contaminated soil and groundwater at the former Clorox campus. ESA will <br /> begin the environmental and regulatory setting portions of the SEIR,and will <br /> inform the City of any environmental constraints that arise during that work <br /> that could help to shape the proposed project(i.e., make it a self-mitigating <br /> project). <br /> ESA will coordinate a visit for key personnel to the project site and <br /> surrounding environs during which time ESA will photograph the site and <br /> the surrounding area to document existing conditions. <br /> Task 2. Notice of Preparation (NOP) <br /> Although an NOP is not required for a Supplemental EIR, should the City <br /> desire to issue one,ESA will prepare a NOP for review and revision by City <br /> staff. The NOP will conform to CEQA Guidelines Sections 15082 and <br /> 15375,which require that at a minimum, a NOP include a project <br /> description, a location map,and a summary of the potential environmental <br /> effects of the project. ESA will file the NOP with the State Clearinghouse, <br /> and provide three hard copies to the City and digital copies.Comments <br /> 1-4 City of Pleasanton Johnson Dave Economic Development Zone EIR <br />