My WebLink
|
Help
|
About
|
Sign Out
05
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2014
>
060314
>
05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2015 4:23:24 PM
Creation date
5/27/2014 3:31:08 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/3/2014
DESTRUCT DATE
15Y
DOCUMENT NO
5
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKGROUND <br /> On an annual basis, the City has two projects designed to maintain the City's roadway <br /> infrastructure. One of these projects is the resurfacing of various roadways by <br /> overlaying existing pavement with a new layer of asphalt concrete, while the other <br /> project is slurry sealing a different set of roadways as preventative maintenance. <br /> The street resurfacing component includes installing a new layer of asphalt concrete <br /> over the existing pavement, repairing pavement distressed areas, crack sealing, <br /> adjusting appurtenances to grade, installing pavement markers, and installing traffic <br /> detector loops. The roadway preventative maintenance component includes preparatory <br /> work for the upcoming slurry seal project (CIP No. 135004). The preventative work will <br /> include sealing pavement cracks and repairing pavement distressed areas. This <br /> preparatory work is generally required prior to the start of the slurry sealing operation <br /> and is included under the project in order to realize cost savings and for optimum <br /> results. The slurry seal project has been awarded and is scheduled to begin <br /> construction upon the completion of the preventative maintenance component under <br /> this project. <br /> DISCUSSION <br /> The first component of the project consists of approximately 1,320,000 square feet of <br /> pavement resurfacing for the following streets: <br /> STREET NAME BEGIN LOCATION END LOCATION TREATMENT(*) <br /> FAIRLANDS DR BROCKTON DR CREEK BRIDGE OL. <br /> FAIRLANDS DR CHELSEA BROCKTON DR SAMI <br /> CHURCHILL DR CHELSEA DR FAIRLANDS DR(EAST) SAMI <br /> CHURCHILL CT FAIRLANDS DR END _. _-___ _ _ __. . OL/F_ <br /> WHITEHALL CT GULFSTREAM ST END OUF <br /> MANCHESTER ST FAIRLANDS DR END OL/F <br /> CROFTERS CT FAIRLANDS DR END. SAMI <br /> BAIRN CT FAIRLANDS DR END SAMI <br /> DUNSMUIR CIR PIMLICO DR(SOUTH) PIMLICO.DR(NORTH) SAMI <br /> DUNSMUIR CT DUNSMUIR CIR END SAMI <br /> PIMLICO DR FAIRLANDS DR GUTHRIE ST SAMI <br /> KIRKALDY DR PIMLICO DR MENDENHALL CT SAMI <br /> KIRKALDY CT KIRKALDY DR END OUF <br /> BRENT CT KIRKCALDY DR END OL/F <br /> RANDICK CT W LAS POSITAS BLVD END OUF <br /> BOARDWALK ST W LAS POSITAS BLVD VERMONT PLACE OUF <br /> W LAS POSITAS BLVD MELBOURNE CT 108'N/O PARK PLACE OL/F <br /> HUFF CT _. HUFF DR END _ _OUF <br /> RASMUSSEN CT HUFF DR END OL/F <br /> AUTUMN CT HARVEST CIR END OUF <br /> SUMMER CT --- -- HARVEST CIR - END - - OUF <br /> WINTER CT HARVEST CIR END OUF <br /> FALL CT HARVEST CIR END OL/F <br /> HARVEST CIR DEL VALLEPKWY(W) DEL VALLE PKWY(E)" - - --OUF <br /> WINDMILL LANE END END OL/F <br /> PEACEFUL LANE WINDMILL LANE ABBIE ST OL/F <br /> WINDMILL WAY BERNAL'AVE WINDMILL LANE-- - OUF <br /> ABBIE CT ABBIE ST END OUF <br /> Page 2 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.