My WebLink
|
Help
|
About
|
Sign Out
10B
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2014
>
061714
>
10B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2015 4:27:01 PM
Creation date
5/23/2014 3:28:22 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/17/2014
DESTRUCT DATE
15Y
DOCUMENT NO
10B
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r, <br /> RECYCLED WATER INFRASTRUCTURE EXPANSION - DESIGN <br /> PROJECT DESCRIPTION: <br /> Development of the City's Recycled Water Project includes the construction of approximately 13 miles <br /> of new distribution system pipeline in existing development, as well as the buy-in cost and expansion <br /> of treatment capacity at the DSRSD Waste Water Treatment Facility.This project includes design costs <br /> only. Other project costs will be developed consistent with funding and completion of design. <br /> The recycled water distribution system will originate from the DSRSD Waste Water Treatment <br /> Facility,connect through the majority of Hacienda Business Park,ultimately reaching Santa Rita Road <br /> to connect to the Tassajara Reservior along Tassajara Road. The system will also connect southward to <br /> include the Sports Park and Tennis Community Park. The City is currently pursuing a loan from the <br /> CW State Revolving Fund to meet project costs. <br /> PROJECT JUSTIFICATION: <br /> Development of a recycled water system will provide a drought-proof, locally controlled source of <br /> water for the purpose of irrigating landscaping. Therefore reducing the City's need and demand for <br /> potable water. Such a system will provide drought protection to significantly important playing fields <br /> within the City. <br /> PROJECT COST ESTIMATE <br /> Item Cost Funding Source Total <br /> Recycled Water Connection <br /> Project Design $1,032,000 <br /> Fee/Recycled Water Surcharge* $1,032,000 <br /> Construction Management $830,000 <br /> *The City is currently pursuing a CW <br /> Distribution System Construction $7,490,000 State Revolving Fund ban for project <br /> costs <br /> Contingency $1,490,000 <br /> Treatment Expansion $1,420,000 <br /> DSRSD Buy-In Contribution $1,498,000 <br /> Admin/L.egalNalue Engineering $1,240,000 <br /> TOTAL $15,000,000 TOTAL $1,032,000 <br /> CIP#: 141026 CATEGORY: RECOMMENDATION: Fund in 2014-15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.