My WebLink
|
Help
|
About
|
Sign Out
05
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2014
>
052014
>
05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2015 4:27:44 PM
Creation date
5/14/2014 3:55:54 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
5/20/2014
DESTRUCT DATE
15Y
DOCUMENT NO
5
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
21.In accordance with Climate Action Plan Measure WA-3-4, the project shall <br /> incorporate rain harvesting. An acceptable method to achieve this measure is to <br /> direct roof leaders into landscaping areas. <br /> Building and Safety Division <br /> 22.Building and site plans are to be submitted to the Building and Safety Division on a <br /> computer disk in a format approved by the Chief Building Official. Digitized <br /> information shall be submitted before requesting a final inspection and should reflect <br /> as built site and architectural information as approved by the Chief Building Official. <br /> 23.The applicants shall submit a pad elevation certification prepared by a <br /> licensed land surveyor or registered civil engineer to the Chief Building <br /> Official, certifying that the pad elevations and building location (setbacks) are <br /> pursuant to the approved plans, prior to receiving a foundation inspection <br /> for the structure. <br /> 24.The height of the building shall be surveyed and verified as being in <br /> conformance to the approved building height as shown on Exhibit "B" or as <br /> otherwise conditioned. Said verification is the project developer's <br /> responsibility, shall be performed by a licensed land surveyor or civil <br /> engineer, and shall be completed and provided to the Building and Safety Division <br /> before the first framing inspection by the Building and Safety Division. <br /> Engineering Division <br /> 25.If any modifications to the public improvements are proposed, they shall meet the <br /> City of the Pleasanton's current standards of public improvements, and shall be <br /> subject to the review and approval by the City Engineer. <br /> 26.The relocation of public sanitary sewer line shall be subject to the review and <br /> approval by the City Engineer. The sewer line shall be designed per current City of <br /> Pleasanton design and maintenance standards. <br /> 27.The public sanitary sewer line shall be outside any bio-retention areas, and shall be <br /> within the Sanitary Sewer Easement to the City or Public Service Easement. <br /> 28.The relocation of the private sanitary sewer laterals shall be acceptable to the <br /> adjacent property owner(s) affected by the relocation of sanitary sewer line. <br /> Urban Stormwater <br /> 29.The project developer shall include erosion control measures, prepared and signed <br /> by the Qualified Storm Water Pollution Prevention Plan Developer (QSD), on the <br /> final grading plan, subject to the review of the City Engineer. This erosion control <br /> measures shall be as required by the state's Construction General Permit. The <br /> project developer is responsible for ensuring that the contractor is aware of such <br /> measures. All cut and fill slopes shall be revegetated and stabilized as soon as <br /> PUD-85-02-02D-06M, Lexus of Pleasanton Page 4 of 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.