My WebLink
|
Help
|
About
|
Sign Out
05
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2014
>
052014
>
05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2015 4:27:44 PM
Creation date
5/14/2014 3:55:54 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
5/20/2014
DESTRUCT DATE
15Y
DOCUMENT NO
5
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11.In accordance with Climate Action Plan Measure NM1-4, the applicant or <br /> responsible party shall provide for bicycle-related improvements. Said <br /> improvements may include, bicycle storage (wall mounted racks in covered areas for <br /> employees and wave racks in public areas), or other alternative approved by the <br /> Director of Community Development. <br /> 12.In accordance with Climate Action Plan Measure TDM1-6, the applicant shall <br /> provide at least one electric charging station for plug-in vehicles. Said charging <br /> station shall be identified on plans submitted to the Building and Safety Division for <br /> permits. <br /> 13..In accordance with Climate Action Plan Measure TDM2-7, the applicant or <br /> responsible party shall provide transit passes or other transit use incentives for a <br /> period of one year to new employees establish transit use patterns for employees. <br /> 14.In accordance with Climate Action Plan Measure EC1-1, the project shall meet the <br /> LEED "Certified' rating level and incorporate shade trees, light-colored roofing, and <br /> landscaping lighting. Alternative measures subject to the review and approval of the <br /> Director of Community Development. <br /> 15.In accordance with Climate Action Plan Measure EC4-4, the project shall incorporate <br /> solar tubes, skylights, and other daylighting systems within the design. Said <br /> systems shall be identified on plans submitted to the Building and Safety Division for <br /> permits. <br /> 16.In accordance with Climate Action Plan Measure ER2-3, the project shall incorporate <br /> distributed generation (e.g. photovoltaic, solar thermal, solar hot water, or solar <br /> cooling), and/or provide bloom box or other fuel cell technologies. Said measures <br /> shall be identified on plans submitted to the Building and Safety Division for permits. <br /> 17.In accordance with Climate Action Plan Measure ER2-5, the project shall include a <br /> solar grid to power one or more EV charging stations. <br /> 18.In accordance with Climate Action Plan Measure SW2-12, the project shall <br /> incorporate adequate space and logistics for handling of recyclable and compostable <br /> materials. <br /> 19.In accordance with Climate Action Plan Measure WA1-7, the project shall <br /> incorporate a water-saving landscape plan that includes xeriscaping and drought- <br /> tolerant planting instead of lawns. Plans submitted to the Building and Safety <br /> Division for permits shall include a final planting plan that incorporates this measure. <br /> 20.In accordance with Climate Action Plan Measure WA3-2, the project shall utilize <br /> reclaimed wastewater. <br /> PUD-85-02-02D-06M, Lexus of Pleasanton Page 3 of 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.