My WebLink
|
Help
|
About
|
Sign Out
RES 14666
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2010-2019
>
2014
>
RES 14666
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2014 3:39:44 PM
Creation date
4/18/2014 3:39:43 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
3/18/2014
DESTRUCT DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. City shall not be required to pay the Recharge Fee as required by Section B, <br /> Paragraph 4 of the Contract for water production above its Independent Quota during the <br /> declared water shortage, as described in this Amendment. <br /> 3. City shall produce as much water each calendar year during this declared water <br /> shortage as is reasonably possible to reduce its need for Zone 7 water deliveries. <br /> IN WITNESS WHEREOF,the parties hereto have placed their duly authorized <br /> signatures on or before the date first above written. <br /> ZONE 7: PLEASANTON: <br /> Alameda County Flood Control and CITY OF PLEASANTON <br /> WATER CONSERVATION DISTRICT, <br /> ZONE 7 <br /> G.F. Duerig, General Manager Nelson Fialho, City Manager <br /> Approved as to form: Attest: <br /> Deputy County Counsel Karen Diaz,City Clerk <br /> Approved as to form: <br /> Jonathan Lowell, City Attorney <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.