My WebLink
|
Help
|
About
|
Sign Out
22 ATTACHMENT 06
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2014
>
041514
>
22 ATTACHMENT 06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2015 3:39:32 PM
Creation date
4/4/2014 1:29:10 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/15/2014
DESTRUCT DATE
15Y
DOCUMENT NO
22 ATTACHMENT 6
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
concrete or shall be an approved crib wall type. Calculations signed <br /> by a registered civil engineer shall accompany the wall plans. <br /> 62. The project developer shall submit plot plans for each of the <br /> residential lots showing building setbacks and a topographic plan <br /> showing grading and drainage. Pad elevations, finish floor <br /> elevations, retaining walls, easements, maximum height of the <br /> highest structure, and the front, rear, and side yards are to be <br /> indicated on the plan. Plans for custom lots are to be signed by a <br /> registered civil engineer. All residential plot plans shall show <br /> compliance with Sections 2907(d) and 70012(d) of the Uniform <br /> Building Code. <br /> 63. The project developer shall submit two (2) copies of the site soils <br /> report to the Director of Building Inspection for third party peer <br /> review and shall pay for such review at the time specified by the <br /> Director, but in all cases before the issuance of a grading permit. <br /> 64. The project developer shall submit record tract grading plans <br /> showing: <br /> a. the elevation of all four (4) corners of the lot as well as the <br /> center of the lot; <br /> b. all top and toe of slope elevations, and <br /> c. the top and toe of all retaining wall elevations. <br /> 65. The record grading plan is to be submitted to the Director of <br /> Building Inspection before the first house final. <br /> 66. The soils engineer shall certify the pad compactions of all lots <br /> containing fill to the satisfaction of the Director of Building <br /> Inspection prior to the issuance of building permits. <br /> 67. Building and situs plans are to be submitted to the Building <br /> Department on computer disk in a format approved by the Director. <br /> Digitized information shall be submitted before requesting a final <br /> inspection and should reflect as-built situs and architectural <br /> information as approved by the Director. <br /> 68. All initial site improvements and house construction activities shall <br /> be limited to the hours of 8:00 a.m. to 5:00 p.m., Monday through <br /> Friday. All construction equipment must meet Department of Motor <br /> Conditions of Approval,PUD-5,Centex Homes'Apperson Ridge June 5.2001 <br /> Page 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.