My WebLink
|
Help
|
About
|
Sign Out
02
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2014
>
031814
>
02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2015 3:13:43 PM
Creation date
3/12/2014 3:55:14 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
3/18/2014
DESTRUCT DATE
15Y
DOCUMENT NO
2
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKGROUND <br /> The original two pools at the Aquatic Center, located at 4455 Black Avenue, were <br /> constructed in 1968. The diving pool was added in 1976, and then in 1996, the facility <br /> was expanded with a 50 meter pool and improved locker facilities. While this <br /> improvement project was initially intended to include other improvements, for example, a <br /> toddler pool and filtration improvements, lack of funding prevented these additional <br /> improvements from being completed. Since that time, the CIP has included a number of <br /> projects to address facility improvements but higher priorities have limited work at the <br /> Aquatic Center to routine maintenance. <br /> Two of the primary issues that faced the facility were the deteriorating concrete decks <br /> and an inadequate filtration system. These issues were not only related to general <br /> maintenance concerns but also represented a broader health and safety concern <br /> associated with code requirements that mandated each pool have its own filtration <br /> system. <br /> DISCUSSION <br /> On August 21, 2012, the construction contract for the Dolores Bengtson Aquatic Center <br /> Renovation project was awarded to West Bay Builders, Inc. in the amount of$2,973,000 <br /> with a total project budget of $3,757,386. Funding for the project was provided in CIP <br /> No. 087038. The project costs to the City for the Dolores Bengtson Aquatic Center <br /> totaled $3,684,456 including construction contract change orders, the restoration of the <br /> slide at the training pool, for Furniture, Fixtures and Equipment (FF&E), and various <br /> other expenses. These expenditures included additional grading requirements, <br /> screening and fencing needs, and expenses associated with grand opening activities. <br /> Additionally, $33,424 is being retained in the CIP project to fund the replacement of the <br /> badly aged floors in the existing locker rooms and other areas of the complex. <br /> Staff recommends the remainder of the balance $39,506 be transferred to the Capital <br /> Improvement Program Reserve project, CIP No. 068018. <br /> The subject project is now ready for acceptance by City Council. <br /> Submitted by: Fiscal Review: Approved by: <br /> A/61-7 <br /> %,ulie Yuan iu Emily Aner Nelson Fialho <br /> (Assistant City Manager/ Director of Finance City Manager <br /> Director of Administrative Services <br /> Attachments: <br /> 1. Funding and Expenditure Summary <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.