Laserfiche WebLink
a trail along the Arroyo; provision of neighborhood open space; the extension and <br /> connection of Nevada Street to Stanley Boulevard; and complete loop improvements for <br /> sewer and water service. <br /> On the other hand, the Parkside neighborhood, which has worked closely with <br /> SummerHill homes to address its concerns with the proposed apartment development on <br /> West Las Positas, has expressed interest in re-examining the zoning on the other half of <br /> that site and converting it back to commercial use only. <br /> EAST PLEASANTON SPECIFIC PLAN STATUS <br /> The East Pleasanton Specific Plan Task Force has been meeting for the last 18 months <br /> and has been overseeing the preparation of a plan for the future development and <br /> conservation of about 1,100 acres of land formerly mined for sand and gravel resources. <br /> A Preliminary Draft Specific Plan is close to completion and when released would provide <br /> a discussion document for the Task Force and the public to consider the appropriate level <br /> of development for the area. The comprehensive planning for the future re-use of this <br /> area is called for in the City's General Plan, with future land uses including residential, <br /> retail and commercial, industrial, public and institutional, and parks and open space. In <br /> addition to the desire to plan this area with infrastructure and facilities complementary to <br /> the rest of the City, at the time the City Council initiated this planning process, it was also <br /> seen as a location for housing that would be needed to meet the City's regional housing <br /> needs for 2014-2022. However, as the previous sections of this report indicate, it is now <br /> apparent that there are sufficient sites already zoned which can accommodate the <br /> housing need for the 2014-2022 planning period. <br /> With this in mind, there are various options to consider for the East Pleasanton planning <br /> effort, including: <br /> • Complete the Specific Planning process. The Preliminary Draft Specific Plan <br /> would be widely distributed and discussions with neighbors and the larger <br /> community would be facilitated and the results reported back to the East <br /> Pleasanton Task Force for their final action on the Preliminary Draft Plan. The <br /> Draft Environmental Impact Report (Draft EIR) would be completed and released <br /> for public review. The Draft Specific Plan and Final EIR would be the subject of <br /> formal discussion and review by the Planning Commission and the City Council at <br /> the end of 2014. Annual build-out of the residential portion of the Plan would be <br /> limited to a share of the annual Growth Management allocation of 238 residential <br /> units citywide5. <br /> • Complete the Specific Plan and include a Phasing Plan. Work on the Specific <br /> Plan would be completed as described above together with a Phasing Plan that <br /> would phase the construction of the major infrastructure components and would <br /> prioritize development areas over several years while retaining some area for <br /> 5 It should be noted that four multifamily developments approved in 2013 and totaling 1,127 units included <br /> Development Agreements which will allow those residential units to be built during the term of the agreement(all are <br /> for 10 years)regardless of the citywide Growth Management Ordinance allocation. <br /> Page 6 of 7 <br />