My WebLink
|
Help
|
About
|
Sign Out
07
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2014
>
020414
>
07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2015 3:00:24 PM
Creation date
1/30/2014 3:38:38 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/4/2014
DESTRUCT DATE
15Y
DOCUMENT NO
7
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment A <br /> Work Program 01/27/14 <br /> EPS Work Program <br /> EPSP.Phase H Analysis <br /> EPS Scope of Work <br /> EPS will build on the previously completed infrastructure financing, economic feasibility, and <br /> fiscal impact analysis work conducted for the East Pleasanton Specific Plan (EPSP). Under <br /> additional services, EPS will evaluate the preliminary draft EPSP with the following tasks <br /> envisioned. <br /> Task 1 - Economic Feasibility Analysis <br /> Subtask 1.1 Preliminary Draft EPSP <br /> EPS will update the economic feasibility analysis for the Preliminary Plan based on any changes <br /> since completion of the last draft. In addition, this task will include an analysis of the following <br /> key parameters: <br /> • Summery discussion and estimate of the least amount of residential development <br /> (65 pe-cent single-family/35 percent multifamily) that might be needed to accomplish an <br /> economically feasible EPSP. <br /> • Implications of the potential school site on economic feasibility. <br /> • Inclusion of an increased cost to be paid to the County for improvements along Stanley <br /> Boulevard. <br /> • Impliccitions of reducing house sizes assumed in previous studies.' <br /> • A summary section explaining and evaluating use of the "residual value" in the analysis. <br /> • A minor overview of potential options for funding the EPSP infrastructure. <br /> EPS will produce a draft economic feasibility memorandum and undergo two sets of iterations <br /> based on input from the City staff. EPS will be available for five meetings, including two <br /> meetings with staff, one presentation to the Task Force, one presentation to the Planning <br /> Commission, and one presentation to the City Council. <br /> Budget Estimate (inclusive of five meetings): $18,000 <br /> Subtask 12 Draft EPSP <br /> EPS will conduct an economic feasibility analysis, similar to the one described above, for the <br /> Draft EPSP document, if different from the Preliminary Draft Plan. This work will be summarized <br /> in a draft memorandum subject to one revision based on the comments from City staff. This <br /> task consists of three meetings: one meeting with City staff, one Planning Commission <br /> meeting, and one City Council meeting. <br /> Budget Estimate (inclusive of three meetings)`: $7,000 <br /> P:U2l000i121090EastPleasanton\Admin1121090_Proposal Addendum2.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.