Laserfiche WebLink
• <br /> ç1\Oa <br /> O F T W A R E <br /> a a . . 0 . K x K S W n K. . a 4 a . K 4 K x K . K K n . o . K z . . W 0 K 0 K. . . . K 0 K. is K K K w e K K <br /> look. Using Collab (Civica client extranet), phone calls and Web meetings, the Civica Content Migration <br /> team will implement a personal approach to content migration and relocation. <br /> Throughout the entire development cycle, we maintain a system that replicates your final deployment <br /> environment. All functionality testing and development will take place on this system to ensure an <br /> accurate representation of the eventual Web portal. <br /> Although testing occurs throughout the project, in this stage the site is scrutinized on multiple platform, <br /> browser, and bandwidth environments. The various systems planned for the site will be tested and all <br /> subsections will be refined and tested for proper linkages and content control. The ADA compliant version <br /> and "low graphics" version of the Web portal will be developed concurrently with the primary site. <br /> Estimated Timeline: Completion 3-5 weeks from contract <br /> Milestone 5: End-user training <br /> Onsite content editor and system administrator training <br /> Civica Software staff will provide 1 full day of end-user training for up to 20 users (2 sessions lasting 2.5 <br /> hours each). Each session will take basic content editors through the tools necessary to routinely <br /> maintain and update the content on the Web site and the procedures for creating and posting new <br /> content onto existing pages. These"content editor"training sessions will be conveniently held at your <br /> offices. <br /> • Create and edit page content <br /> • Best practices for importing and working offline <br /> • Use of basic modules (News, Calendar, Filebank, etc.) <br /> In addition Civica Software staff will provide one half day of in depth "system administrator" training for up <br /> to 10 selected users in the full use of the Civica administration system. Session topics will include: <br /> • Set up all user rights and privileges <br /> • Configure Workflow and approver level assignment <br /> • Understand all Civica tools necessary to routinely maintain and redesign the Web site <br /> • Update the content on the Web site, and create and post new content onto existing pages <br /> This system administrator training session will run for approximately 3 hours. This training will be provided <br /> at your offices. Typically, there is also additional Web-based training for 1-2 key members during the <br /> content migration phase. <br /> Estimated Timeline: Completion 2 weeks before completion of information architecture and <br /> content migration <br /> Milestone 6: Quality assurance and technology transfer <br /> Although the site will be continually tested during the entire duration of development, a final checking and <br /> testing will take place at this stage. Civica will either transfer the development site to Civica's hosting <br /> server or assist in the deployment of the new site on your servers, wherever they are located. If a beta <br /> (soft-launch) is desired, Civica will assist in appropriately configuring the current site so that the public <br /> may view the new site via a link from the current Web site, or alternatively link back to the previous site <br /> from the new redesign (if client hosts). A feedback form will be created so that residents can submit <br /> comments and suggestions. <br /> At the point of soft or hard launch, the site will go-live. The City will take full control of the maintenance of <br /> all sections, including full access to the source code for the purpose of disaster recovery. <br /> PLEASANTON-WEB SITE-REDESIGN-02 4 of 13 <br />