My WebLink
|
Help
|
About
|
Sign Out
CCMIN051606
City of Pleasanton
>
CITY CLERK
>
MINUTES
>
2000-2009
>
2006
>
CCMIN051606
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2013 5:01:52 PM
Creation date
10/15/2013 5:01:49 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
MINUTES
DOCUMENT DATE
5/16/2006
DESTRUCT DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Brozosky asked about removal of the culverts in option 1. <br /> Mr. Wilson replied the removal would not occur in phase I; a small wooden bridge would <br /> be in place. <br /> Ms. McGovern commented on the invasive plants in view A; she does not support <br /> removal of the invasive plants in other areas. <br /> Mr. Wilson noted that this issue would be addressed with the contractor. <br /> Ms. McGovern asked if staff could assist in the identification of invasive plants. Park <br /> maintenance staff would be maintaining the creek in the future. <br /> Mr. Wilson stated that it is recommended to hire a contract maintenance firm for the first <br /> five years. <br /> Ms. McGovern asked about the steel versus wooden bridges. <br /> Mr. Wilson responded that steel is recommended primarily due to the vehicle loads. <br /> Mc. McGovem asked about the contingency balance remaining in the CIP fund, and if <br /> any mature trees could be saved. <br /> Mr. Wilson verified the CIP balance and that mature trees would not be removed. <br /> Ms. McGovem asked about replacing the railings on bridge and if trash receptacles and <br /> dog waste bags could be included. <br /> Mr. Wilson noted that the railings will be changed; receptacles and waste bags are not <br /> included in the scope of this project. <br /> Mr. Sullivan commented on the costs associated with vehicle bridges. <br /> Mr. Wilson explained the use of the bridges by maintenance vehicles and clarified the <br /> need for the crossings. <br /> Mr. Sullivan stated that although the project is considered over-budget, that conclusion is <br /> based on engineering estimates, not change orders. <br /> Mr. Wilson stated that the project should be considered under-funded, rather than over <br /> budget. Specific costs will be known after the bid process. The project scope has not changed <br /> but there are not sufficient funds allocated so far for the project. <br /> Mr. Thorne asked if the objective of the project had changed over time. <br /> Mr. Wilson explained that it had changed from a maintenance project to a restoration <br /> project; elements have been added, but the overall project goal has not changed. <br /> Mayor Hosterman invited public comments. <br /> Pleasanton City Council 15 05/16/06 <br /> Minutes <br />
The URL can be used to link to this page
Your browser does not support the video tag.