My WebLink
|
Help
|
About
|
Sign Out
01
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2013
>
101513
>
01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2016 4:12:11 PM
Creation date
10/9/2013 4:02:32 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/15/2013
DESTRUCT DATE
15Y
DOCUMENT NO
01
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the park's main inlets and outlets and the projected level of service at build out, with the residential <br /> exempt from the cap. <br /> City Traffic Engineer Tassano explained that the 1996 General Plan identified mitigations for all major <br /> inlets and outlets. Those mitigations were updated, although most remained exactly the same, as part <br /> of the 2005 General Plan update. The SEIR demonstrated that the improvements identified would be <br /> sufficient to maintain levels of service with the 9.8 million square foot cap and the additional vehicle <br /> trips that accompany residential development. <br /> Councilmember Narum asked if there are plans to implement those mitigations. <br /> Mr. Tassano said the General Plan is very specific about what is necessary to maintain the level of <br /> service and estimated that two of the modifications identified would need to occur sometime between <br /> now and buildout of the city in order to maintain that level of service. <br /> Councilmember Pentin asked and Mr. Tassano confirmed that the mitigations identified for Hacienda <br /> are actually designed for the original 11 million plus square foot cap. Therefore, the mitigations are <br /> sufficient for the reduced 9.8 million square foot cap and additional housing. <br /> Councilmember Brown noted that in the last RHNA cycle, the city's fair share factors only reduced its <br /> allocation 58 units. She said this is not the dramatic decrease that staff indicated. She agreed with <br /> Mayor that job creation increases the need for housing. She referred to the city's Housing Element <br /> Background Report, which states on page 7 that an accepted rule of thumb is that one housing unit is <br /> needed for every 1.5 jobs. She asked what exactly the impact of the build out of Hacienda would have <br /> on RHNA numbers. <br /> Mr. Dolan explained that the ratio to which she referred is useful as a formula that is fairly easily <br /> understood and as a planning concept, but it is not used in determining RHNA. He said he also agreed <br /> with the Mayor that employment is a factor in the overall equation, but that the other factors by which <br /> the city is judged ultimately result in a reduction. He said it would be impossible for him to predict future <br /> RHNA cycles. He noted that the Association of Bay Area Government and Metropolitan Transportation <br /> Commission, which make RHNA allocations, are not even aware of Hacienda's development cap. What <br /> is more likely is that they will look upon the additional housing positively and the net impact of this <br /> action would be minimal in his estimation. <br /> Mayor Thorne clarified his point, which is that RHNA should not be allowed to drive the city's decisions <br /> relative to creating jobs. <br /> Mayor Thorne opened the public hearing. <br /> James Paxson, Hacienda Business Park, expressed his support for the staff recommendation. He <br /> asked that the Council do the same, if for no other reason than that the ambiguity in the current <br /> langauge is difficult to navigate and could potentially impede business development. He stressed the <br /> unique opportunity Hacienda presents for the city, as well as the level of investment put into this part of <br /> north Pleasanton which totals nearly $265 million in today's dollars. The park also maintains a <br /> significant amount of infrastructure that would otherwise be managed by the city, an ongoing <br /> investment that totals another $45 million to date in today's dollars. Hacienda presents a unique fiscal <br /> opportunity in that additional development carry little if any additional infrastructure impact to the city. <br /> The sustainable vision outlined in the General Plan can happen in Hacienda in a way that it cannot <br /> elsewhere. With regards to existing development potential under the cap, he noted that much of the <br /> 774,000 square feet available if residential were not to be exempt is already called for by approved but <br /> not yet built projects. He stressed that Hacienda's ability to remaim competetive is reliant upon the <br /> remaining square footage that would be available if residential were exempt. With regard to the cost <br /> City Council Minutes Page 7 of 12 September 17, 2013 <br />
The URL can be used to link to this page
Your browser does not support the video tag.