Laserfiche WebLink
17. Before a building final and/or a project final, all landscaping shall be installed and <br /> reviewed and approved by the Planning Division. <br /> 18. The project applicant/developer and/or the development's homeowners association are <br /> encouraged to use best management practices for the use of pesticides and herbicides. <br /> 19. The project applicant/developer shall submit an updated noise analysis with the first on- <br /> site/building permit application demonstrating that the project is in compliance with the <br /> noise measures identified in the Addendum to the SEIR for the subject project to the <br /> satisfaction of the Director of Community Development. <br /> 20. Prior to the issuance of a grading/onsite permit, whichever is sooner, the project <br /> applicant/developer shall submit verification to the satisfaction of the City Engineer or <br /> Chief Building and Safety Official, of compliance with the Federal Aviation Administration <br /> (FAA) Part 77 (Form 7460 review) for construction on the project site. <br /> Building Design <br /> 21. Prior to receiving a foundation inspection for each apartment building and single-family <br /> building, the project applicant/developer shall submit a building pad elevation and <br /> foundation setback certification prepared by a licensed land surveyor or registered civil <br /> engineer to the Chief Building Official and the Director of Community Development, <br /> certifying that the pad elevations and building locations (setbacks) are pursuant to the <br /> approved plans, prior to receiving a foundation inspection for the structures. <br /> 22. The height of the structures covered by this approval shall be surveyed and verified as <br /> being in conformance to the approved building heights as shown on Exhibit B or as <br /> otherwise conditioned. Said verification is the project applicant's or developer's <br /> responsibility, shall be performed by a licensed land surveyor or civil engineer, and shall <br /> be completed and provided to the Planning Division before the first framing or structural <br /> inspection by the Building and Safety Division. <br /> 23. Rain gutters from the buildings shall discharge into landscaping planter areas to pretreat <br /> the storm water unless the buildings are connected to an on-site filtration system, such as <br /> vegetative swales, to pretreat storm water before discharge to the storage ponds on the <br /> adjoining City property. These details shall be shown on the plans submitted to the <br /> Building and Safety Division for plan check and are subject to the review and approval of <br /> the Director of Community Development prior to building permit issuance. <br /> 24. The project applicant/developer shall incorporate solar tubes, skylights, and/or other <br /> daylighting systems, subject to the satisfaction of the Director of Community <br /> Development, within the designs of the recreation building. The method used and plan <br /> details shall be incorporated into the plans submitted to the Building and Safety Division <br /> for plan check and shall be subject to the review and approval of the Director of <br /> Community Development prior to building permit issuance. <br /> 25. The project applicant/developer shall install Energy Star appliances, such as HVAC <br /> equipment, food preparation equipment, and water heaters in each apartment unit and <br /> single-family unit. The appliances and how they adhere to the Energy Star standards <br /> shall be stated on the building plans submitted for the issuance of a building permit to the <br /> satisfaction of the Director of Community Development. <br /> Page 3 <br />