Laserfiche WebLink
17. Before a building final and /or a project final, all landscaping shall be installed and <br />reviewed and approved by the Planning Division. <br />18. The project applicant/developer and /or the development's homeowners association are <br />encouraged to use best management practices for the use of pesticides and herbicides. <br />19. The project applicant/developer shall submit an updated noise analysis with the first on- <br />site /building permit application demonstrating that the project is in compliance with the <br />noise measures identified in the Addendum to the SEIR for the subject project to the <br />satisfaction of the Director of Community Development. <br />20. Prior to the issuance of a grading /onsite permit, whichever is sooner, the project <br />applicant/developer shall submit verification to the satisfaction of the City Engineer or <br />Chief Building and Safety Official, of compliance with the Federal Aviation Administration <br />(FAA) Part 77 (Form 7460 review) for construction on the project site. <br />Building Design <br />21. Prior to receiving a foundation inspection for each apartment building and single - family <br />building, the project applicant/developer shall submit a building pad elevation and <br />foundation setback certification prepared by a licensed land surveyor or registered civil <br />engineer to the Chief Building Official and the Director of Community Development, <br />certifying that the pad elevations and building locations (setbacks) are pursuant to the <br />approved plans, prior to receiving a foundation inspection for the structures. <br />22. 'The height of the structures covered by this approval shall be surveyed and verified as <br />being in conformance to the approved building heights as shown on Exhibit B or as <br />otherwise conditioned. Said verification is the project applicant's or developer's <br />responsibility, shall be performed by a licensed land surveyor or civil engineer, and shall <br />be completed and provided to the Planning Division before the first framing or structural <br />inspection by the Building and Safety Division. <br />23. Rain gutters from the buildings shall discharge into landscaping planter areas to pretreat <br />the storm water unless the buildings are connected to an on -site filtration system, such as <br />vegetative swales, to pretreat storm water before discharge to the storage ponds on the <br />adjoining City property. These details shall be shown on the plans submitted to the <br />Building and Safety Division for plan check and are subject to the review and approval of <br />the Director of Community Development prior to building permit issuance. <br />24. 'The project applicant/developer shall incorporate solar tubes, skylights, and /or other <br />daylighting systems, subject to the satisfaction of the Director of Community <br />Development, within the designs of the recreation building. The method used and plan <br />details shall be incorporated into the plans submitted to the Building and Safety Division <br />for plan check and shall be subject to the review and approval of the Director of <br />Community Development prior to building permit issuance. <br />25. 'The project applicant/developer shall install Energy Star appliances, such as HVAC <br />equipment, food preparation equipment, and water heaters in each apartment unit and <br />single- family unit. The appliances and how they adhere to the Energy Star standards <br />shall be stated on the building plans submitted for the issuance of a building permit to the <br />satisfaction of the Director of Community Development. <br />Page 3 <br />