My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2013
>
091713
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2013 12:21:13 PM
Creation date
9/12/2013 3:20:38 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/17/2013
DESTRUCT DATE
15Y
DOCUMENT NO
04
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Parking - Fire Lane." The signs and curbs shall be shown on the improvement plans to <br />the satisfaction of the City Engineer and the Director of Community Development. <br />144. The buildings covered by this approval shall be equipped with an automatic fire sprinkler <br />system. Plans and specifications for the automatic fire sprinkler system shall be submitted <br />for review and approval by the Livermore - Pleasanton Fire Department prior to installation. <br />The fire alarm system, including water flow and valve tamper, shall have shop drawings <br />submitted for review and approval by the Livermore - Pleasanton Fire Department prior to <br />installation. All required inspections and witnessing of tests shall be completed prior to <br />final inspection and occupancy of the building(s). <br />145. Valve tamper and water flow shall be monitored by an approved supervising station in <br />accordance with NFPA 72 and the California Fire Code. <br />STANDARD CONDITIONS OF APPROVAL <br />Fire <br />146. The apartments shall have valve tamper and water flow connected to an Underwriters <br />Laboratory (UL) listed Central Station Service. Fire Department plan check includes <br />specifications, monitoring certificate(s), installation certificate and alarm company UL <br />certificate. <br />147. The project applicant/developer shall keep the site free of fire hazards from the start of <br />lumber construction until the final inspection. <br />148. Fire alarm control panel and remote annunciation shall be at location(s) approved by the <br />Fire Prevention Bureau. All systems shall be point identified by individual device and <br />annunciated by device type and point. <br />149. All fire sprinkler system water flow and control valves shall be complete and serviceable <br />prior to final inspection. Prior to the occupancy of a building having a fire alarm system, <br />the Fire Department shall test and witness the operation of the fire alarm system. <br />150. Prior to any construction framing, the project applicant/developer shall provide adequate <br />fire protection facilities, including, but not limited to a water supply and water flow in <br />conformance to the City's Fire Department Standards able to suppress a major fire. <br />151. All fire sprinkler system water flow and control valves shall be complete and serviceable <br />prior to final inspection. Prior to the occupancy of a building having a fire alarm system, <br />the Fire Department shall test and witness the operation of the fire alarm system. <br />152. The Fire Prevention Bureau reviews building /civil drawings for conceptual on -site fire <br />mains and fire hydrant locations only. Plan check comments and approvals DO NOT <br />INCLUDE: <br />• Installation of the on -site fire mains and fire hydrants. Specific installation drawings <br />submitted by the licensed underground fire protection contractor shall be submitted to <br />the Fire Prevention Bureau for approval. <br />• Backflow prevention or connections to the public water mains. <br />Page 28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.